No Part/Section |
No Technical Element |
Document-wide |
General |
The phrase “advanced non‑LWR” is used throughout the standard but is not defined. |
Clarification |
The standard may be applied to any non-light water reactor (NLWR), regardless of whether the NLWR incorporates one or more of the attributes listed in the Commission’s “Policy Statement on the Regulation of Advanced Reactors” (73 FR 60612; October 14, 2008). |
No Part/Section |
No Technical Element |
Document-wide |
References |
Use of references: The various references may be acceptable in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification |
For every reference cited in the standard: No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Section 1 - Introduction |
No Technical Element |
Section 1 |
Section 1.1 through Section 1.12 |
------------------------ |
No objection |
------------------------ |
Section 2 - Acronyms and Definitions |
No Technical Element |
Section 2.1 |
Acronyms |
------------------------ |
No objection |
------------------------ |
Section 2 - Acronyms and Definitions |
No Technical Element |
Section 2.2 |
Feasibility |
In the context of operator actions, several high-level requirements and supporting requirements refer to “feasibility”; however, this term is not defined in the NLWR PRA standard. Feasibility is a continuous step in the human reliability analysis (HRA) process. Definitions related to feasibility are needed to eliminate ambiguous interpretation. |
Qualification |
Add the following definitions:
(1) Feasibility assessment—the qualitative consideration of whether the operator action can be accomplished, considering several performance‑shaping factors.
(2) Feasible—an operator action that can be credited in a PRA model if the action has met all the feasibility assessment criteria (see supporting requirement HR‑H2). |
Section 3 - Risk Assessment Application Process |
No Technical Element |
Section 3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 3 - Risk Assessment Application Process |
No Technical Element |
Section 3.1 |
Figure 3-1 |
------------------------ |
No objection |
------------------------ |
Section 3 - Risk Assessment Application Process |
No Technical Element |
Section 3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 3 - Risk Assessment Application Process |
No Technical Element |
Section 3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.2.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-1 |
HLR-POS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-1 |
HLR-POS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-1 |
HLR-POS-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-1 |
HLR-POS-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A8 |
Operations personnel supporting a licensing application should support efforts to confirm that the selection of POSs correctly represents the as-designed and as-intended-to-operate plant. Without this supporting confirmation from operations personnel, the PRA may exclude potential risk contributors due to a lesser degree of plant representation. |
Qualification |
For PRAs performed during the pre-operational stage, INTERVIEW knowledgeable engineering and operations personnel to confirm that the selection of plant operating states correctly represents the as-designed, and as-intended-to-operate plant. |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-2 |
POS-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B1 |
The requirement should assess whether grouping of POSs impacts risk-significant event sequences. Without such an assessment, event sequences that might otherwise be considered risk-significant may not be categorized as such. |
Qualification |
CC-I
GROUP plant evolutions into a set of representative evolutions. ENSURE that
(a) the evolutions within a group can be considered similar in terms of the set of plant operating states that they contain;
(b) the evolutions are bounded by the worst case impact within the group;
(c) the grouping does not impact risk‑significant event sequences. |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-3 |
POS-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-4 |
POS-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-4 |
POS-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-4 |
POS-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-4 |
POS-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-4 |
POS-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-5 |
POS-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-5 |
POS-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
POS - Plant Operating State Analysis |
Table 4.3.1.1-5 |
POS-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.1.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-1 |
HLR-IE-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-1 |
HLR-IE-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-1 |
HLR-IE-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-1 |
HLR-IE-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-2 |
IE-A18 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-3 |
IE-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C9 |
If operator actions are relied upon to detect and correct conditions that may lead to a complicated shutdown, the reliability of those actions should be shown to have an exceedingly low probability of failure (i.e., the collective failure probability for all operator actions in a given event sequence is less than or equal to 10‑5) as assessed against human reliability analysis requirements for NLWR PRA endorsed by the NRC. |
Clarification |
(b) either:
(1) the event has the same impact on the plant as another event that has a much higher frequency per the requirements of SCR-1 or SCR-2 in Table 1.10-1, or
(2) the event does not require the plant to go to shutdown conditions until sufficient time has expired during which the initiating event conditions, with a high degree of certainty (based on supporting calculations such that the collective failure probability is less than or equal to 10-5 and in conformance with human reliability technical elements, are detected and corrected (either administratively or automatically) such that a complicated shutdown does not occur per the requirements of SCR-3 in Table 1.10-1. |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C18 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-4 |
IE-C19 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-5 |
IE-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-5 |
IE-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
IE - Initiating Event Analysis |
Table 4.3.2.1-5 |
IE-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.2.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-1 |
HLR-ES-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-1 |
HLR-ES-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-1 |
HLR-ES-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-1 |
HLR-ES-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-2 |
ES-A15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-3 |
ES-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-4 |
ES-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-5 |
ES-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-5 |
ES-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ES - Event Sequence Analysis |
Table 4.3.3.1-5 |
ES-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.3.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.3.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.3.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-1 |
HLR-SC-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-1 |
HLR-SC-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-1 |
HLR-SC-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-2 |
SC-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-3 |
SC-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-4 |
SC-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-4 |
SC-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SC - Success Criteria Development |
Table 4.3.4.1-4 |
SC-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.4.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.4.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.4.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.5.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-1 |
HLR-SY-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-1 |
HLR-SY-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-1 |
HLR-SY-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A18 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A19 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A20 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A21 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A22 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A23 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A24 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A25 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A26 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A27 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A28 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A29 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A30 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A31 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A32 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-2 |
SY-A33 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-3 |
SY-B17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-4 |
SY-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-4 |
SY-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SY - Systems Analysis |
Table 4.3.5.1-4 |
SY-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.5.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.5.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.5.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.6.1 |
Section text |
Use of the term “unscreened” may imply that an item was previously screened out and subsequently screened back into the PRA. However, this term is interpreted as meaning activities that were included in the PRA for consideration and evaluation (i.e., screened in). |
Clarification |
...(c) human failure events (HFEs) are defined for unscreened activities modeled in the PRA; |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-E |
Not including errors of commission (EOCs) presumes that EOCs are not important or significant contributors to the NLWR PRA; however, it is currently not known whether that is the case. Though there is significant experience with operating light-water reactors (LWRs) to justify the consensus approach of excluding EOCs from the Level 1/LERF LWR PRA standard, there is little to no operating experience for NLWRs dictating that the same approach can be applied. It is expected that NLWRs will rely less on human actions than operating LWRs, which implies that EOCs would play a more important role in NLWR PRAs. In addition, there is no consensus for LWRs regarding whether EOCs should be addressed in the accident progression analysis (i.e., Level 2 PRA). Likewise, there is currently no basis for excluding EOCs from the mechanistic source term analysis in a NLWR PRA. |
Qualification |
A systematic review of relevant available procedures, any past operational events, procedural guidance, and training shall be used to identify the set of post-initiator operator responses required for each of the event sequences , as well as the well‑intended post-initiator operator responses that result in adverse safety impacts. |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-H |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-1 |
HLR-HR-I |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-2 |
HR-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-3 |
HR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-3 |
HR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-3 |
HR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-4 |
HR-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D4 |
The detailed human error probability (HEP) assessments for an operating plant would not be realistic due to not including the information listed in the CC-II of HR-D4. Using the phrase “when available,” with respect to an operating plant, may result in the CC-II of HR-D4 being interpreted as not applicable due to the information not being available. For an operating plant, this information should be available. |
Clarification |
CC-II
For each detailed HEP assessment, INCLUDE in the evaluation process the following plant- or design-specific relevant information when available: |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D6 |
The recovery of pre-initiator errors assessment would be incomplete due to not using all the information listed in HR-D6. By using the phrase “if available,” HR-D6 may be interpreted as not applicable due to the information not being available. For an operating plant, all the information listed in HR-D6 should be available. |
Clarification |
For operating plants, if recovery of pre-initiator errors is credited, USE the following information, if available, to assess the potential... |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-5 |
HR-D10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E4 |
Not including errors of commission (EOCs) presumes that EOCs are not important or significant contributors to NLWR PRA; however, it is currently not known whether that is the case. Though there is significant experience with operating light-water reactors to justify the consensus approach of excluding errors of commission (EOCs) from the Level 1/LERF LWR PRA standard, there is little to no operating experience for NLWRs justifying that the same approach can be applied. It is expected that NLWRs will rely less on human actions than operating LWRs, which implies that EOCs would play a more important role in NLWR PRAs. Additionally, there is no consensus for LWRs regarding whether EOCs should be addressed in the accident sequence progression analysis (i.e., Level 2 PRA). Likewise, there is currently no basis for excluding EOCs from the mechanistic source term analysis in a NLWR PRA. |
Qualification |
Add the following to item HR-E4:
“(c) those well-intended actions performed by control room staff that disable a system, subsystem, or component needed in an event scenario.” |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-6 |
HR-E9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-7 |
HR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-7 |
HR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-7 |
HR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-7 |
HR-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-7 |
HR-F5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G1 |
Some HRA methods include a feasibility step during the qualitative analysis and other HRA methods do not include the step. Since it is up to the NLWR PRA developer to choose which HRA method to use, not all HRA methods include this step, and feasibility assessment is a continuous step in the HRA process, it is important to assess the feasibility of a human action (even during quantification). Further, ESQ-C7 requires that human actions be feasible in order to use their respective HEPs in event sequence quantification. Since the NLWR PRA standard does not explicitly require a feasibility assessment, this step in the HRA process may be missed, which would cause the PRA model to underestimate the risk from that human action. |
Qualification |
CC-I
ASSESS the feasibility of the HFEs before assigning the final HEPs using the criteria in HR-H2. For HFEs determined to be feasible, USE conservative estimates for the HEPs of the HFEs in the event sequences that survive initial quantification.
CC-II
ASSESS the feasibility of the HFEs before assigning the final HEPs using the criteria in HR-H2. For HFEs determined to be feasible, PERFORM detailed analyses for estimation of HEPs for risk-significant HFEs. For the HEPs of HFEs that are not risk-significant, ENSURE the requirement for CC-I is met. |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G4 |
Communication is an important performance‑shaping factor for actions taken outside the main control room (e.g., in fire scenarios) and that require complex coordination, such as the use of FLEX equipment. As such, all aspects of communication should be evaluated when estimating HEPs. |
Clarification |
CC-II
(p) communication among personnel on the same team and on different teams. |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-8 |
HR-G16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H2 |
Having a limited set of feasibility criteria and constraining their applicability only to recovery actions (i.e., a special case of post-initiator actions) may result in an incomplete feasibility assessment and assigning an HEP of less than 1.0 when the assigned value should be 1.0 (see the “Issue” column for HR-G1). Ensuring that there is sufficient command and control, and communications is important because NLWRs lack the operating experience and the NLWR PRA standard scope includes all radiological sources, all hazards, all POSs, and all levels of analysis. |
Qualification |
Add the following two feasibility criteria:
(f) there is a sufficient plan for command and control; and
(g) there is a sufficient plan for communications. |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-9 |
HR-H6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-10 |
HR-I1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-10 |
HR-I2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HR - Human Reliability Analysis |
Table 4.3.6.1-10 |
HR-I3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.6.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.6.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.6.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.7.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-1 |
HLR-DA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-1 |
HLR-DA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-1 |
HLR-DA-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-1 |
HLR-DA-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-1 |
HLR-DA-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-2 |
DA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-3 |
DA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-3 |
DA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C18 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C19 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C20 |
When crediting equipment repair, generic industry data should not be used in cases where plant-specific data is available. Crediting generic industry data may underestimate risk from a failure to repair event(s), which can mask the importance of other risk contributors. |
Qualification |
…IDENTIFY instances of plant-specific experience or and, when that is insufficient to estimate failure to repair consistent with DA-D10, applicable industry experience and for each repair, COLLECT… |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C21 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C22 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C23 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C24 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C25 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-4 |
DA-C26 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-5 |
DA-D10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-6 |
DA-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-6 |
DA-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
DA - Data Analysis |
Table 4.3.7.1-6 |
DA-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.7.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.7.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.7.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-1 |
HLR-FLPP-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-1 |
HLR-FLPP-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-1 |
HLR-FLPP-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-2 |
FLPP-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B6 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
EVALUATE the Internal Flood Plant Partitioning for the as-built, as-operated or as-designed, as-intended-to-operate plant conditions via walkdowns or, for PRAs performed during the preoperational phase, investigation(s) depending… |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-3 |
FLPP-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-4 |
FLPP-C1 |
A walkdown should be performed for post-operational plants and should not be replaced with an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation instead of a walkdown when a walkdown is possible may result in a mischaracterization the plant response in the PRA. |
Clarification |
…
(b) the general nature and key or unique features of the partitioning elements that define each flood area;
(c) any walkdowns or, for PRAs performed during the preoperational phase, investigation(s) performed in support of the plant partitioning;
… |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-4 |
FLPP-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPP - Internal Flood Plant Partitioning |
Table 4.3.8.1-4 |
FLPP-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-1 |
HLR-FLSO-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-1 |
HLR-FLSO-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A2 |
Fluid sources other than water and steam can produce flooding effects that are unlike water and steam and may result in risk-significant contributors. A lack of consideration of other fluid sources besides water may exclude significant sources of flooding and underestimate risk. |
Clarification |
IDENTIFY the potential flood sources that include water, steam, and other liquids (e.g., lubricating oil, fuel oil). |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A7 |
A walkdown should be performed for post-operational plants and should not be replaced with an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation instead of a walkdown when a walkdown is possible may result in a mischaracterization the plant response in the PRA. |
Clarification |
…
CONFIRM the accuracy of information collected from plant information sources for the as-designed, or as-built, or as-operated and as-intended-to-operate plant conditions via walkdowns or, for PRAs performed during the preoperational phase, investigation(s)… |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-2 |
FLSO-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-3 |
FLSO-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-3 |
FLSO-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSO - Internal Flood Sources Identification and Characterization |
Table 4.3.8.2-3 |
FLSO-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Table 4.3.8.3-1 |
HLR-FLSN-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-1 |
HLR-FLSN-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A18 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A19 |
A walkdown should be performed for post-operational plants and should not be replaced with an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation instead of a walkdown when a walkdown is possible may result in a mischaracterization the plant response in the PRA. |
Clarification |
EVALUATE the accuracy of information collected from plant information sources for the as-designed, or as-built, and as-operated or as-intended-to-operate plant conditions via walkdowns or, for PRAs performed during the preoperational phase, investigation(s) depending… |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A20 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-2 |
FLSN-A21 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-3 |
FLSN-B1 |
A walkdown should be performed for post-operational plants and should not be replaced with an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible.
Performing an investigation instead of a walkdown when a walkdown is possible may result in a mischaracterization the plant response in the PRA. |
Clarification |
…
(f) calculations or other analyses used to support or refine the flooding evaluation;
(g) walkdowns or, for PRAs performed during the preoperational phase, investigation(s) performed;
… |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-3 |
FLSN-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLSN - Internal Flood Scenarios Development |
Table 4.3.8.3-3 |
FLSN-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4-1 |
HLR-FLEV-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4-1 |
HLR-FLEV-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4-1 |
HLR-FLEV-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.2 |
FLEV-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.2 |
FLEV-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.2 |
FLEV-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.2 |
FLEV-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.3 |
FLEV-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.4 |
FLEV-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.4 |
FLEV-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLEV - Internal Flood Initiating Events |
Table 4.3.8.4.4 |
FLEV-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-1 |
HLR-FLPR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-1 |
HLR-FLPR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-1 |
HLR-FLPR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-2 |
FLPR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-2 |
FLPR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-2 |
FLPR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-3 |
FLPR-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-4 |
FLPR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-4 |
FLPR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLPR - Internal Flood Plant Response |
Table 4.3.8.5-4 |
FLPR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-1 |
HLR-FLHR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-1 |
HLR-FLHR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-1 |
HLR-FLHR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-1 |
HLR-FLHR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-1 |
HLR-FLHR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-2 |
FLHR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-2 |
FLHR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-3 |
FLHR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-3 |
FLHR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-3 |
FLHR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-4 |
FLHR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-5 |
FLHR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-5 |
FLHR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-5 |
FLHR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-6 |
FLHR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-6 |
FLHR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLHR - Internal Flood Human Reliability Analysis |
Table 4.3.8.6-6 |
FLHR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-1 |
HLR-FLESQ-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A6 |
Walkdowns should be performed for post-operational plants and should not be replaced with an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation instead of a walkdown when a walkdown is possible may result in a mischaracterization the plant response in the PRA. |
Clarification |
COLLECT inputs to the following analyses, which support quantifications of flood-induced event sequences, from plant or design information sources, as applicable, or via walkdowns or, for PRAs performed during the preoperational phase, investigation(s):… |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-2 |
FLESQ-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-3 |
FLESQ-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-4 |
FLESQ-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-5 |
FLESQ-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-6 |
FLESQ-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-6 |
FLESQ-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-7 |
FLESQ-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-7 |
FLESQ-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-7 |
FLESQ-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-7 |
FLESQ-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FLESQ - Internal Flood Event Sequence Quantification |
Table 4.3.8.7-7 |
FLESQ-F5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.8.8.3.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-1 |
HLR-FPP-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-1 |
HLR-FPP-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-1 |
HLR-FPP-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-2 |
FPP-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-3 |
FPP-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-4 |
FPP-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-4 |
FPP-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPP - Internal Fire Plant Boundary Definition and Partitioning |
Table 4.3.9.1-4 |
FPP-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-1 |
HLR-FES-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-1 |
HLR-FES-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-1 |
HLR-FES-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-1 |
HLR-FES-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-2 |
FES-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-3 |
FES-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-3 |
FES-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-3 |
FES-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-4 |
FES-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-4 |
FES-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-4 |
FES-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-5 |
FES-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-5 |
FES-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FES - Internal Fire Equipment Selection |
Table 4.3.9.2-5 |
FES-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-1 |
HLR-FCS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-1 |
HLR-FCS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-1 |
HLR-FCS-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-2 |
FCS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-2 |
FCS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-2 |
FCS-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-2 |
FCS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-3 |
FCS-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-3 |
FCS-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-3 |
FCS-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-4 |
FCS-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-4 |
FCS-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCS - Internal Fire Cable Selection and Location |
Table 4.3.9.3-4 |
FCS-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-1 |
HLR-FQLS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-1 |
HLR-FQLS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-2 |
FQLS-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-3 |
FQLS-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-3 |
FQLS-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FQLS - Internal Fire Qualitative Screening |
Table 4.3.9.4-3 |
FQLS-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-1 |
HLR-FPRM-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-1 |
HLR-FPRM-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-1 |
HLR-FPRM-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-2 |
FPRM-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-2 |
FPRM-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-2 |
FPRM-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-3 |
FPRM-B17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-4 |
FPRM-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-4 |
FPRM-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-4 |
FPRM-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FPRM - Internal Fire Plant Response Model |
Table 4.3.9.5-4 |
FPRM-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-1 |
HLR-FSS-H |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-2 |
FSS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-2 |
FSS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-2 |
FSS-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-2 |
FSS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-3 |
FSS-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-3 |
FSS-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-4 |
FSS-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-5 |
FSS-D11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-6 |
FSS-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-6 |
FSS-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-6 |
FSS-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-6 |
FSS-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-6 |
FSS-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-7 |
FSS-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-7 |
FSS-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-8 |
FSS-G9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-9 |
FSS-H1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-9 |
FSS-H2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-9 |
FSS-H3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FSS - Internal Fire Scenario Selection and Analysis |
Table 4.3.9.6-9 |
FSS-H4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-1 |
HLR-FIGN-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-1 |
HLR-FIGN-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-2 |
FIGN-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-3 |
FIGN-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-3 |
FIGN-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FIGN - Internal Fire Ignition Frequency |
Table 4.3.9.7-3 |
FIGN-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.8 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8.1 |
HLR-FCF-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8.1 |
HLR-FCF-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-2 |
FCF-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-2 |
FCF-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-2 |
FCF-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-2 |
FCF-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-3 |
FCF-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-3 |
FCF-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FCF - Internal Fire Circuit Failure Analysis |
Table 4.3.9.8-3 |
FCF-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.9 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-1 |
HLR-FHR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-1 |
HLR-FHR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-1 |
HLR-FHR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-1 |
HLR-FHR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-1 |
HLR-FHR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-2 |
FHR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-2 |
FHR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-2 |
FHR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-3 |
FHR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-3 |
FHR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-4 |
FHR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-5 |
FHR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-5 |
FHR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-5 |
FHR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-6 |
FHR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-6 |
FHR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FHR - Internal Fire Human Reliability Analysis |
Table 4.3.9.9-6 |
FHR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.10 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-1 |
HLR-FESQ-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-2 |
FESQ-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-2 |
FESQ-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-2 |
FESQ-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-2 |
FESQ-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-2 |
FESQ-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-3 |
FESQ-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-4 |
FESQ-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-5 |
FESQ-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-5 |
FESQ-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-5 |
FESQ-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-6 |
FESQ-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-6 |
FESQ-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-7 |
FESQ-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-7 |
FESQ-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-7 |
FESQ-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
FESQ - Internal Fire Event Sequence Quantification |
Table 4.3.9.10-7 |
FESQ-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.8 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.9 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.9.11.3.10 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-H |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-1 |
HLR-SHA-I |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-2 |
SHA-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-3 |
SHA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-3 |
SHA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-3 |
SHA-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-3 |
SHA-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-3 |
SHA-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-4 |
SHA-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-4 |
SHA-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-4 |
SHA-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-4 |
SHA-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-4 |
SHA-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-5 |
SHA-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-5 |
SHA-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-5 |
SHA-D3 |
Ground motion prediction equations with alternative distance and magnitude scaling behaviors accounts for an important source of uncertainty in the ground motion characterization model. If only a range of amplitudes is considered in the ground motion characterization model without alternative distance and magnitude scaling, the uncertainty in the seismic hazard may be underestimated. |
Clarification |
ENSURE that uncertainties are included in the model such that the aggregate of predicted ground motions captures the range of ground motions that can occur at a site as well as alternative magnitude and distance scaling in accordance with the level of analysis identified for the SRs of HLR‑SHA-A and the data and information identified in the SRs of HLR-SHA-B.
… |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-5 |
SHA-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-6 |
SHA-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-7 |
SHA-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-7 |
SHA-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-7 |
SHA-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-7 |
SHA-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-8 |
SHA-G1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-8 |
SHA-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-9 |
SHA-H1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-9 |
SHA-H2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-9 |
SHA-H3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-9 |
SHA-H4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-10 |
SHA-I1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-10 |
SHA-I2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SHA - Seismic Hazard Analysis |
Table 4.3.10.1-10 |
SHA-I3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-1 |
HLR-SFR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-2 |
SFR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-2 |
SFR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-3 |
SFR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-4 |
SFR-C1 |
The inherently rugged component groups are based on earthquake experience and data from operating light-water reactors. Nonlight-water reactors can have SSCs that differ in form and design from light-water SSCs. This may result in either these SSCs not being covered by the current inherently rugged component groups or demonstrating that these SSCs are similar to a particular current inherently rugged component group. Further, the bounding site or range of sites can have a seismic hazard exceeding that used to develop the current inherently rugged component list. Therefore, use of the inherently rugged component groups based on LWRs needs justification and the basis for screening of inherently rugged components needs to be specified. Inappropriate screening of inherently rugged components may result in their exclusion from a seismic PRA and/or in an underestimation of risk. |
Clarification |
SPECIFY the basis for screening of inherently rugged components justifying the applicability to the plant. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-4 |
SFR-C2 |
The methodologies and approaches for determining the fragility thresholds is based on operating light-water reactor seismic risk and seismic PRA experience (e.g., generic lognormal uncertainty parameters dependent on type or location of SSC, relative contribution to total seismic risk of assuming that a failure leads directly to core damage).These state-of-practice methodologies and approaches may not be applicable to nonlight-water designs or their applicability may need a design-specific technical basis. Further, the same threshold may not be applicable to a range of sites and, for such cases, use of a single threshold would need justification. Inappropriate fragility thresholds may result in inadvertent screening out of components from inclusion in an SPRA and/or an underestimation of risk. |
Clarification |
SPECIFY the basis and methodologies established for achieving the fragility thresholds defined in Requirement SPR-B5 justifying the applicability to the plant and site or range of sites identified in SHA-A1. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D2 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
EVALUATE the seismic capacity of the as-designed, or as-built, or as-operated or as-intended-to-operate plant conditions via walkdowns or, for PRAs performed during the preoperational phase, investigation(s). |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D5 |
Pathways for operators to access SSCs or controls outside the control room and potential pathway unavailability should be included in the walkdown evaluation of potential functional and structural failure mechanisms, equipment anchorage, and support load paths to ensure that these unavailabilities are accounted for in the feasibility evaluation of operator actions considered for the SPRA. The walkdown information is used not only by fragility analysts but also by plant response analysts. Therefore, such information will inform the plant response analysts about the feasibility of certain operator actions. If this evaluation is not performed during the walkdown, the PRA may include operator actions that would be infeasible due to a necessary path being unavailable and therefore, impact the plant response characteristics and insights. |
Clarification |
EVALUATE potential functional and structural failure mechanisms, equipment anchorage, and support load path. , and pathways necessary for performing required ex‑control room actions. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-5 |
SFR-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E3 |
The applicability of generic data to a given SSC should be justified. This is because of the potential for SSCs in NLWR designs that may not correspond to established SSC categories and/or may not be in common SSC locations in the plant. When estimating fragilities for PRAs developed for the pre-operational phase, demonstrating that generic or conservative assumptions are bounding for the range of anticipated sites helps ensure that these fragilities can reasonably reflect the as-designed or as-to-be-built plant. If such assumptions cannot be shown to be bounding for the range of anticipated sites, the results may not appropriately reflect the expected plant response. |
Clarification |
CC-I
ESTIMATE conservative seismic fragilities for the failure mechanisms of interest identified in Requirement SFR-E1 using plant-specific data, or JUSTIFY the use of generic fragility data (e.g., fragility test data, generic seismic qualification test data, and earthquake experience data) or conservative assumptions for the SSCs as being applicable to the SSC and appropriate for the plant.
CC-II
CALCULATE realistic seismic fragilities for the failure mechanisms of interest identified in Requirement SFR-E1 using plant-specific data, or JUSTIFY (e.g., through the calculation of integrated risk metrics defined in Requirement RI-B3) the use of generic fragility data (e.g., fragility test data, generic seismic qualification test data, and earthquake experience data) or conservative assumptions for any SSCs as being applicable to the SSC and appropriate for the plant or by showing no masking or differences in insights. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E4 |
The applicability of generic data to a given SSC should be justified. This is because of the potential for SSCs in NLWR designs that may not correspond to established SSC categories and/or may not be in common SSC locations in the plant. When estimating fragilities for PRAs developed for the pre-operational phase, demonstrating that generic or conservative assumptions are bounding for the range of anticipated sites helps ensure that these fragilities can reasonably reflect the as-designed or as-to-be-built plant. If such assumptions cannot be shown to be bounding for the range of anticipated sites, the results may not appropriately reflect the expected plant response. |
Clarification |
CC-I
ESTIMATE contact chatter seismic fragilities for relays and other similar devices that affect SSCs identified in the Systems Analysis and JUSTIFY the use of generic fragility data or conservative assumptions as being applicable and appropriate for the plant.
CC-II
CALCULATE contact chatter seismic fragilities using plant-specific data or JUSTIFY the applicability and use of generic fragility data for relays and other similar devices that affect risk-significant SSCs and are identified in the Systems Analysis. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E5 |
The applicability of generic data to a given SSC should be justified. This is because of the potential for SSCs in NLWR designs that may not correspond to established SSC categories and/or may not be in common SSC locations in the plant. When estimating fragilities for PRAs developed for the pre-operational phase, demonstrating that generic or conservative assumptions are bounding for the range of anticipated sites helps ensure that these fragilities can reasonably reflect the as-designed or as-to-be-built plant. If such assumptions cannot be shown to be bounding for the range of anticipated sites, the results may not appropriately reflect the expected plant response. |
Clarification |
CC-I
ESTIMATE seismic fragilities for credible seismic-induced flood sources (see Requirement SFR-D6) and seismic-induced fire ignition sources (see Requirement SFR-D7) and JUSTIFY the use of generic fragility data or conservative assumptions as being applicable and appropriate for the plant.
CC-II
CALCULATE seismic fragilities using plant-specific data or JUSTIFY the applicability and use of generic fragility data for credible seismic-induced flood sources (see Requirement SFR‑D6) and seismic-induced fire ignition sources (see Requirement SFR-D7) that are risk-significant contributors. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2-6 |
SFR-E7 |
The sources of uncertainty, related assumptions, and reasonable alternatives for the seismic fragility analysis for pre-operational stage PRAs are not coupled to SR SPR-E8, which determines the impact of the sources of uncertainty on event sequence families and the resulting impact on decisions using the PRA. Merely identifying the sources of uncertainties for pre-operational phase PRAs does not provide sufficient information to determine their impact on the event sequence families and the decisions therefrom. The sources of uncertainty in pre-operational stage PRAs are expected to be different from those during the operational stages. |
Qualification |
For PRAs performed during the pre-operational stage, IDENTIFY assumptions made due to the lack of as-built, as-operated details that influence the Seismic Fragility Analysis in a manner that supports Requirement SPR‑E8. |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2.7 |
SFR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2.7 |
SFR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SFR - Seismic Fragility Analysis |
Table 4.3.10.2.7 |
SFR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-1 |
HLR-SPR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-2 |
SPR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-2 |
SPR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-2 |
SPR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-2 |
SPR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-3 |
SPR-B13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-4 |
SPR-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-5 |
SPR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-5 |
SPR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-5 |
SPR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-5 |
SPR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-5 |
SPR-D5 |
The feasibility of operator actions in seismic PRA should be assessed. Further, ESQ-C7 requires that human actions be feasible to use their HEPs in event sequence quantification.
The CC-II requirement incorrectly states that CC-I of HLR-HR-G should be satisfied. |
Qualification |
CC-I
When addressing feasibility, influencing factors, and the timing considerations covered in Requirements HR-G1, HR‑G4, HR-G6, and HR-G8, INCLUDE…
CC-II
For developing HEPs, SATISFY the Capability Category I II SRs of HLR‑HR‑G, except where the requirements are not applicable, taking into account relevant seismic related effects on control room and ex-control room post-initiator actions. When addressing feasibility influencing factors and the timing considerations covered in Requirements HR-G1, HR-G4, HR-G6, and HR-G8, INCLUDE the effect of the seismic hazard on the control room and ex-control room human actions. |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-6 |
SPR-E8 |
This SR evaluates the sources of uncertainty, related assumptions, and reasonable alternatives for the seismic fragility analysis. This SR should be coupled with SFR-E6 because it is important to determine and disposition and impact of these sources of uncertainty for pre-operational stage PRAs. Not identifying and dispositioning the impacts of the identified sources of model uncertainty, related assumptions, and reasonable alternatives for pre-operational stage PRAs can negatively influence the decisions made using these PRAs. |
Clarification |
SATISFY Requirement ESQ‑E1 with the additional assumptions identified by each seismic technical sub-element in Requirement SHA-F3, fragility analysis, Requirement SFR‑E6 , SFR-E7, or both and system modeling, Requirement SPR‑E6, SPR-E7 or both. |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-7 |
SPR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-7 |
SPR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-7 |
SPR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-7 |
SPR-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
SPR - Seismic Plant Response Model |
Table 4.3.10.3-7 |
SPR-F5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.10.4.3.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-1 |
HLR-HS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-1 |
HLR-HS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-1 |
HLR-HS-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-1 |
HLR-HS-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-1 |
HLR-HS-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-2 |
HS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-2 |
HS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-2 |
HS-A3 |
Plant -specific hazards should be identified as part of the identification of hazards or hazard groups. If plant-specific hazards or hazard groups are not identified, the PRA model may exclude significant risk contributors, underestimate risk, or both. |
Clarification |
IDENTIFY site- , plant-, or and design-unique hazards and hazard groups not already identified in Requirement HS-A2. |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-2 |
HS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B2 |
Limiting reviews of information about regional-, industrial-, governmental-, and plant-funded evaluations for each hazard only to operating plants potentially excludes relevant hazard information for plants in the pre-operational stages of the plant life cycle. These types of reviews should be performed for any stage of the plant life cycle. |
Clarification |
For PRAs performed on operating plants, REVEW information about regional-, industrial-, governmental-, and plant-funded evaluations for each hazard, if available. |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B5 |
When assessing whether a hazard or hazard group cannot physically impact the plant or plant operations, it is necessary to consider a range of magnitudes and frequencies. Without such consideration, lower frequency events with a higher magnitude that might otherwise prove important to the risk results may be excluded. Additionally, the values in RI-A5 referenced in item (f) are presented as reporting values, not screening values. Using the reporting values as screening values could be too permissive in excluding contributors from the PRA as screening using a consequence criterion may not be effectively equivalent to screening using a frequency criterion. Additionally, this requirement is effectively for qualitative screening, as per SCR‑3 in Table 1.10‑1. Because item (f) is a quantitative criterion, it should not be included in the list. |
Qualification |
USE SCR-3 in Table 1.10-1 when qualitatively screening out a hazard or hazard group by showing that either: |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-3 |
HS-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-4 |
HS-C14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-5 |
HS-D1 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for a post-operational plant may result in a mischaracterization of the plant’s as-built design in the PRA. |
Clarification |
CONFIRM that the basis for the screening out of a hazard or hazard group represents either the as-built, as-operated or as‑designed, as-intended-to-operate plant conditions via a walkdown or, for PRAs performed during preoperational phases, as applicable, conditions through data and findings of investigation(s) of the plant (and its surroundings, as applicable to the hazard). |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-6 |
HS-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-6 |
HS-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-6 |
HS-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
HS - Hazards Screening Analysis |
Table 4.3.11.1-6 |
HS-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.11.2.2.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-1 |
HLR-WHA-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A5 |
The 150-mi distance in this requirement is too prescriptive, arbitrary, and based on the writers' judgement/experience. This doesn’t conform to the revised ASME PRA, where the requirement was revised to be less arbitrary and more evidence based. |
Clarification |
…
a. meet SCR-3 in Table 1.10-1 by showing that the site is more than 150 miles (approximately 250 km) is sufficiently far away from the nearest tropical cyclone-prone coast to screen out tropical cyclone (hurricane or typhoon) high wind hazards from the probabilistic wind hazard analysis; |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-2 |
WHA-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-3 |
WHA-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-4 |
WHA-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-5 |
WHA-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-5 |
WHA-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-6 |
WHA-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-6 |
WHA-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-6 |
WHA-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-6 |
WHA-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-6 |
WHA-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-7 |
WHA-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-7 |
WHA-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-7 |
WHA-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-7 |
WHA-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-8 |
WHA-G1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-8 |
WHA-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-8 |
WHA-G3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WHA - Wind Hazard Analysis |
Table 4.3.12.1-8 |
WHA-G4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Table 4.3.12.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-H |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-1 |
HLR-WFR-I |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A1 |
The performance of SSCs under high wind conditions that are not included in the plant response model, but that physically enclose or protect other SSCs included in the plant response model from high wind effects, needs to be considered. Without consideration of the performance of such SSCs, the plant response model may misrepresent how the plant would respond to failures of such SSCs due to high wind effects, which could therefore exclude important contributors to risk. |
Clarification |
INCLUDE in the scope of the Wind Fragility Analysis those SSCs and associated failure modes identified in the plant response analysis, including those that may not be in the base plant model but that enclose or protect other SSCs from high wind effects. |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-2 |
WFR-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-3 |
WFR-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-4 |
WFR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-4 |
WFR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-4 |
WFR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-4 |
WFR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-5 |
WFR-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-6 |
WFR-E12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-7 |
WFR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-7 |
WFR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-8 |
WFR-G1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-8 |
WFR-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-9 |
WFR-H1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-9 |
WFR-H2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-9 |
WFR-H3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-9 |
WFR-H4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-10 |
WFR-I1 |
Documentation related to SSC failure mechanisms, the treatment of atmospheric pressure changes and missiles, structural interaction effects, wind-driven rain effects, and when possible, the conduct of and observations from walkdowns is necessary to assess whether all important aspects of the high wind PRA are addressed. Without these aspects, the documentation would be incomplete and, therefore, insufficient to determine the acceptability of the high wind PRA. |
Clarification |
f.) the identified SSC failure mechanisms and associated failure modes;
g.) the treatment of wind pressure and atmospheric pressure change effects, wind ‑generated missile effects, structural interaction effects and wind ‑driven rain effects, if relevant to the plant;
h.) walkdown observations following construction completion |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-10 |
WFR-I2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WFR - Wind Fragility Analysis |
Table 4.3.12.2-10 |
WFR-I3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-1 |
HLR-WPR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-2 |
WPR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-2 |
WPR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-2 |
WPR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-2 |
WPR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-3 |
WPR-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-4 |
WPR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-4 |
WPR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-4 |
WPR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-4 |
WPR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-4 |
WPR-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D7 |
All operator actions relevant to the high wind plant response analysis should satisfy the appropriate HRA SRs. Satisfying the related HRA requirements only for certain operator recovery actions relevant to the Wind Plant Response analysis may exclude important contributors to risk. |
Clarification |
For treatment of additional, exclusive operator recovery actions relevant to the Wind Plant Response Analysis, SATISFY SRs of HLR HR-H, except where the requirements are not applicable. |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-5 |
WPR-D11 |
Failing to perform a feasibility assessment may result in some HEPs being assigned a value less than 1.0 when the assigned value should be 1.0. If an HFE that is not feasible is assigned an HEP value less than 1.0, but a feasibility assessment would otherwise demonstrate that the HFE is not feasible, the PRA model may underestimate the risk from that contributor. |
Qualification |
CC-I
…When addressing feasibility, influencing factors, and the timing considerations in Requirements HR-G1, HR-G4, HR-G6, and HR-G8, INCLUDE the effect of high wind hazard on the control room and ex‑control room human actions.
CC-II
…When addressing feasibility, influencing factors, and the timing considerations in Requirements HR-G1, HR-G4, HR-G6, and HR-G8… |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-6 |
WPR-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-7 |
WPR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-7 |
WPR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
WPR - Wind Plant Response Analysis |
Table 4.3.12.3-7 |
WPR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.3.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.12.4.3.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-1 |
HLR-XFHA-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A8 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization of as well as missing information from the plant's as-built design in the PRA. |
Clarification |
CONFIRM that the external flood hazard screening represents either the as-built, as‑operated or as-designed, as-intended-to-operate configuration of the plant, including relevant deficiencies (if applicable), and by performing walkdowns or, for PRAs performed during the preoperational phase, investigations. |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-2 |
XFHA-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-3 |
XFHA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-3 |
XFHA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-3 |
XFHA-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-3 |
XFHA-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-4 |
XFHA-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-5 |
XFHA-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-5 |
XFHA-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-5 |
XFHA-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-5 |
XFHA-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-6 |
XFHA-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-6 |
XFHA-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-6 |
XFHA-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-6 |
XFHA-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-7 |
XFHA-F1 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
COLLECT information via walkdown(s) or, for PRAs performed during the preoperational phase, investigation(s) (complemented, as needed, by hydrologic surveys) about either the as‑built, as‑operated or as-designed, as‑intended-to-operate, as applicable, plant and site characteristics relevant to the hazard analysis such as site topography, features that may affect flow around the site, drainage features, and features that may impound water. |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-7 |
XFHA-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-7 |
XFHA-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-7 |
XFHA-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-8 |
XFHA-G1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-8 |
XFHA-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-8 |
XFHA-G3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFHA - External Flood Hazard Analysis |
Table 4.3.13.1-8 |
XFHA-G4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Table 4.3.13.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-1 |
HLR-XFFR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-2 |
XFFR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-2 |
XFFR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-2 |
XFFR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-2 |
XFFR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-2 |
XFFR-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-3 |
XFFR-B1 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
COLLECT information via walkdown(s) or, for PRAs performed during the preoperational phase, investigation(s) about either the as-built, as‑operated or as‑designed, as-intended-to-operate, as applicable, plant and site characteristics relevant to the fragility evaluation, such as establishing or confirming the location and characteristics of flood protection features, penetrations/seals, and drainage features. |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-3 |
XFFR-B2 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
For operating reactors, ASSESS the condition (e.g., SSC degradation) and configuration of SSCs observed during the walkdowns or, for PRAs performed during the preoperational phase, investigation(s). |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-3 |
XFFR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-3 |
XFFR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-3 |
XFFR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-4 |
XFFR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-4 |
XFFR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-5 |
XFFR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-5 |
XFFR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-5 |
XFFR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-5 |
XFFR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-6 |
XFFR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-6 |
XFFR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-7 |
XFFR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-7 |
XFFR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFFR - External Flood Fragility Analysis |
Table 4.3.13.2-7 |
XFFR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-G |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-1 |
HLR-XFPR-H |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-2 |
XFPR-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-3 |
XFPR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-3 |
XFPR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-3 |
XFPR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-4 |
XFPR-C12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-5 |
XFPR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-5 |
XFPR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-5 |
XFPR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-5 |
XFPR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-5 |
XFPR-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E6 |
Failing to perform a feasibility assessment may result in some HEPs being assigned a value less than 1.0 when the assigned value should be 1.0. If an HFE that is not feasible is assigned an HEP value less than 1.0, but a feasibility assessment would otherwise demonstrate that the HFE is not feasible, the PRA model may underestimate the risk from that contributor. |
Qualification |
CC-I
When addressing feasibility, influencing factors, and the timing considerations in Requirements HR-G1, HR-G4, HR-G6, and HR-G8, INCLUDE the effect of external flooding hazard on the control room and ex‑control room human actions.
CC-II
When addressing feasibility, influencing factors, and the timing considerations in Requirements HR-G1, HR-G4, HR-G6, and HR-G8, INCLUDE the effect of flood impacts external flooding hazard on the control room and ex-control room human actions. |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.14.3-6 |
XFPR-E8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-7 |
XFPR-F7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-8 |
XFPR-G1 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
COLLECT information via walkdown(s) or, for PRAs performed during pre-operational phase, investigation(s) about either the as-built, as-operated or as-designed, as-intended-to-operate, as applicable, plant and site characteristics relevant to the plant response analysis including consideration of operations; flooding design/licensing basis; design, construction, and performance of flood protection features; hydrology and hydraulics; and manual actions. |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-8 |
XFPR-G2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-8 |
XFPR-G3 |
A walkdown should be performed for post-operational plants as part of an investigation. However, a physical walkdown of a plant in the pre-operational phase of development may not always be possible. Performing an investigation that involves something less than a walkdown for post-operational plant may result in a mischaracterization the plant's as-built design in the PRA. |
Clarification |
EVALUATE the external floods plant response analysis for the as-built, as-operated or as-designed, as-intended-to-operate plant conditions via walkdown(s) or, for PRAs performed during pre-operational phase, investigation(s) to do the following: |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-9 |
XFPR-H1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-9 |
XFPR-H2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
XFPR - External Flood Plant Response Analysis |
Table 4.3.13.3-9 |
XFPR-H3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.2.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.3.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.3.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-1 |
HLR-OHA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-1 |
HLR-OHA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-2 |
OHA-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-3 |
OHA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-3 |
OHA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-3 |
OHA-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OHA - Other Hazards Analysis |
Table 4.3.14.1-3 |
OHA-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Table 4.3.14.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-1 |
HLR-OFR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-1 |
HLR-OFR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-2 |
OFR-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-3 |
OFR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-3 |
OFR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OFR - Other Hazards Fragility Analysis |
Table 4.3.14.2-3 |
OFR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-1 |
HLR-OPR-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-1 |
HLR-OPR-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-1 |
HLR-OPR-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-1 |
HLR-OPR-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-1 |
HLR-OPR-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-2 |
OPR-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-2 |
OPR-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-2 |
OPR-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-2 |
OPR-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-3 |
OPR-B12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C6 |
Failing to perform a feasibility assessment may result in some HEPs being assigned a value less than 1.0 when the assigned value should be 1.0. If an HFE that is not feasible is assigned an HEP value less than 1.0, but a feasibility assessment would otherwise demonstrate that the HFE is not feasible, the PRA model may underestimate the risk from that contributor. |
Qualification |
CC-I:
ASSESS the feasibility of the HFE using the criteria in HR-H2. If the HFE is not feasible, ASSIGN an HEP of 1.0 or DO NOT CREDIT the HFE in the PRA. For HFEs determined to be feasible, USE screening values in accordance with Requirement OPR‑C5 for the HEPs for HFEs included in the hazard PRA model.
CC-II:
… Attention is to be given to how the hazard situation alters previous assessments in non-hazard analyses as to the feasibility, influencing factors, and the timing considerations in Requirements HR‑G1, HR-G4, HR-G6, and HR-G8 except when they are not applicable. |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-4 |
OPR-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-5 |
OPR-D9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-6 |
OPR-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-6 |
OPR-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-6 |
OPR-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-6 |
OPR-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
OPR - Other Hazards Plant Response Analysis |
Table 4.3.14.3-6 |
OPR-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.4.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.4.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.4.3.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.4.3.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.14.4.3.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.13.4.3.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-1 |
HLR-ESQ-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-2 |
ESQ-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-3 |
ESQ-B10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C15 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C16 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-4 |
ESQ-C17 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-5 |
ESQ-D8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-6 |
ESQ-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-6 |
ESQ-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-7 |
ESQ-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-7 |
ESQ-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-7 |
ESQ-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-7 |
ESQ-F4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
ESQ - Event Sequence Quantification |
Table 4.3.15.1-7 |
ESQ-F5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.15.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.16 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.16.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-1 |
HLR-MS-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-1 |
HLR-MS-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-1 |
HLR-MS-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-1 |
HLR-MS-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-1 |
HLR-MS-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-2 |
MS-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-2 |
MS-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-2 |
MS-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-2 |
MS-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-2 |
MS-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-3 |
MS-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-4 |
MS-C7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-5 |
MS-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-5 |
MS-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-5 |
MS-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-5 |
MS-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-6 |
MS-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-6 |
MS-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-6 |
MS-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
MS - Mechanistic Source Term Analysis |
Table 4.3.16.1-6 |
MS-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.16.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.16.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.16.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-1 |
HLR-RCRE-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-1 |
HLR-RCRE-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-1 |
HLR-RCRE-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-2 |
RCRE-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-2 |
RCRE-A2 |
There is no requirement to identify the radiological inventory, only the release fraction. This is an issue for PRA quality because the consequences are dependent on the quantity of radionuclides released, which depends upon the inventory as well as the release fraction. The inventory at the time of accident initiation can change over the operating cycle because of, for example, the ingrowth of important long-lived fission products such radiocesium or the decay in important short lived fission products such as radioiodine during and after coastdown. |
Qualification |
…At a minimum, INCLUDE the following characteristics for each release category, if applicable: (a) the number of plumes; (b) the quantity of radionuclides released by species in each time phase of release. the release fraction of each radionuclide group; … |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-2 |
RCRE-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-3 |
RCRE-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-3 |
RCRE-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCRE - Release Category to Radiological Consequence |
Table 4.3.17.1-4 |
RCRE-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-1 |
HLR-RCPA-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-1 |
HLR-RCPA-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-1 |
HLR-RCPA-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A12 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A13 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-2 |
RCPA-A14 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-3 |
RCPA-B8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-4 |
RCPA-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-4 |
RCPA-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCPA - Protective Action Parameters and Other Site Data Analysis |
Table 4.3.17.2-4 |
RCPA-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-1 |
HLR-RCME-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-1 |
HLR-RCME-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-2 |
RCME-A11 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-3 |
RCME-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-3 |
RCME-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCME - Meteorological Data |
Table 4.3.17.3-3 |
RCME-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-E |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-1 |
HLR-RCAD-F |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-2 |
RCAD-A8 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-3 |
RCAD-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-3 |
RCAD-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-4 |
RCAD-C6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-5 |
RCAD-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-5 |
RCAD-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-5 |
RCAD-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-5 |
RCAD-D4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-6 |
RCAD-E7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-7 |
RCAD-F1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-7 |
RCAD-F2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCAD - Atmospheric Transport and Dispersion |
Table 4.3.17.4-7 |
RCAD-F3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-1 |
HLR-RCDO-A |
Skin absorption could be a significant pathway for isotopes that may be important for some designs (e.g., tritium). This is an issue for PRA quality because omission of skin absorption could underestimate doses in such cases. |
Qualification |
The analysis shall include applicable exposure pathways including cloudshine, groundshine, skin deposition, skin absorption, inhalation and ingestion, and the effect of mitigation actions on received dose. |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-1 |
HLR-RCDO-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-1 |
HLR-RCDO-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A1 |
The list of exposure pathways does not include skin absorption. This could be a significant pathway for isotopes that may be important for some designs (e.g., tritium). This is an issue for PRA quality because omission of skin absorption could underestimate doses in such cases. |
Qualification |
…
JUSTIFY excluding any of the following pathways:
(a) cloudshine;
(b) groundshine;
(c) skin deposition;
(d) inhalation;
(e) ingestion;
(f) skin absorption |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A6 |
This supporting requirement conflicts with the requirements of RCDO-A1, which requires the analyst to justify exclusion of the skin absorption and deposition pathways. This is an issue for PRA quality because the exclusion of these pathways without justification may result in underestimation of exposures if the excluded pathways were risk-significant |
Qualification |
CC-I
DO NOT INCLUDE skin deposition pathway in the model.
CC-II
INCLUDE skin deposition and beta exposure to the skin from the plume in the model
CC-I and CC-II
MODEL skin absorption and deposition pathways. |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A8 |
This supporting requirement conflicts with the requirements of RCDO-A1, which requires the analyst to justify exclusion of ingestion pathways. This is an issue for PRA quality because the exclusion of this pathway without justification may result in underestimation of exposure if the excluded pathway is risk-significant |
Qualification |
CC-I
DO NOT INCLUDE ingestion pathways in the model.
CC-II
USE generic intake quantities of foodstuffs and water.
CC-I and CC-II
USE typical or average intake quantities of foodstuffs and water reflecting national or regional dietary patterns.
USE national or regional agricultural productivity input parameters. |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A9 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-2 |
RCDO-A10 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-3 |
RCDO-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-3 |
RCDO-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-4 |
RCDO-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCDO - Dosimetry |
Table 4.3.17.5-4 |
RCDO-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-1 |
HLR-RCHE-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-1 |
HLR-RCHE-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-1 |
HLR-RCHE-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-2 |
RCHE-A7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-3 |
RCHE-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-3 |
RCHE-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-3 |
RCHE-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-4 |
RCHE-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-4 |
RCHE-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCHE - Health Effects |
Table 4.3.17.6-4 |
RCHE-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.7 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-1 |
HLR-RCEC-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-1 |
HLR-RCEC-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-1 |
HLR-RCEC-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-2 |
RCEC-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-2 |
RCEC-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-3 |
RCEC-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-4 |
RCEC-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-4 |
RCEC-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCEC - Economic Factors |
Table 4.3.17.7-4 |
RCEC-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.8 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-1 |
HLR-RCQ-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-1 |
HLR-RCQ-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-1 |
HLR-RCQ-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-1 |
HLR-RCQ-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-2 |
RCQ-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-2 |
RCQ-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-2 |
RCQ-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-3 |
RCQ-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-3 |
RCQ-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-3 |
RCQ-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-4 |
RCQ-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-4 |
RCQ-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-5 |
RCQ-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-5 |
RCQ-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RCQ - Consequence Quantification |
Table 4.3.17.8-5 |
RCQ-D3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.9.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.9.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.17.9.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.18 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.18.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-1 |
HLR-RI-A |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-1 |
HLR-RI-B |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-1 |
HLR-RI-C |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-1 |
HLR-RI-D |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-2 |
RI-A1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-2 |
RI-A2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-2 |
RI-A3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-2 |
RI-A4 |
Using generic reporting requirements in place of application-specific reporting requirements may result in information important to the decision-making process not being provided. Such reporting requirements should be provided by the appropriate regulatory authority on an application-specific basis. |
Qualification |
USE a application-specific minimum reporting guidance frequency of 10-7 per plant-year for all modeled event sequence families or JUSTIFY an alternative. |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-2 |
RI-A5 |
Using generic reporting requirements in place of application-specific reporting requirements may result in information important to the decision-making process not being provided and consequences may not be expressed in terms of dose units. Such reporting requirements should be provided by the appropriate regulatory authority on an application-specific basis. |
Qualification |
USE a application-specific minimum reporting guidance consequence of 10% of the consequences due to background radiation dose for consequence metrics associated with all modeled event sequence families or JUSTIFY an alternative. |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B4 |
Use of the term “unscreened” may imply that an item was previously screened out and subsequently screened back into the PRA. However, this term is interpreted as meaning sources of radioactive material that were included in the PRA for consideration and evaluation (i.e., screened in). |
Clarification |
INCLUDE the risk contributions from modeled event sequence families involving releases from multiple reactors and unscreened all sources of radioactive material modeled in included in the scope of the PRA. |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B5 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B6 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-3 |
RI-B7 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-4 |
RI-C1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-4 |
RI-C2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-4 |
RI-C3 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-4 |
RI-C4 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-5 |
RI-D1 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
RI - Risk Integration |
Table 4.3.18.1-5 |
RI-D2 |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.18.2.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.18.2.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 4 - Risk Assessment Technical Requirements |
No Technical Element |
Section 4.3.18.2.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
No Technical Element |
Section 5.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
No Technical Element |
Section 5.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-1 |
HLR-CC-A |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-1 |
HLR-CC-B |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-1 |
HLR-CC-C |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-1 |
HLR-CC-D |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-1 |
HLR-CC-E |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A1 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A2 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A3 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A4 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A5 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-2 |
CC-A6 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-3 |
CC-B1 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-3 |
CC-B2 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-3 |
CC-B3 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-3 |
CC-B4 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-3 |
CC-B5 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-4 |
CC-C1 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-4 |
CC-C2 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-5 |
CC-D1 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-6 |
CC-E1 |
------------------------ |
No objection |
------------------------ |
Section 5 - PRA Configuration Control |
CC - Configuration Control |
Table 5.8-6 |
CC-E2 |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.3 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.4 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.5 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 6 - Peer Review |
No Technical Element |
Section 6.6 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
No Technical Element |
Section 7.1 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
No Technical Element |
Section 7.2 |
Section text |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-A |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-B |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-C |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-D |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-E |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-1 |
HLR-NM-F |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-2 |
NM-A1 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-2 |
NM-A2 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-2 |
NM-A3 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-3 |
NM-B1 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-3 |
NM-B2 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-3 |
NM-B3 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-3 |
NM-B4 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C1 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C2 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C3 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C4 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C5 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-4 |
NM-C6 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-5 |
NM-D1 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-5 |
NM-D2 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-5 |
NM-D3 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-6 |
NM-E1 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-6 |
NM-E2 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-6 |
NM-E3 |
------------------------ |
No objection |
------------------------ |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-7 |
NM-F1 |
Any manipulation of data performed to support an NDM should be documented along with the sources of data and the collection process. Without documenting how data may have been manipulated, the impacts of that manipulation may not be understood and, depending on how the data is manipulated, the use of the NDM in the PRA could potentially underestimate risk. |
Clarification |
(e) the sources of data, and the collection process and data manipulation performed in support of the Newly Developed Methods; |
Section 7 - Newly Developed Methods |
NM - Newly Developed Methods |
Table 7.2-7 |
NM-F2 |
------------------------ |
No objection |
------------------------ |