Part/Section | Technical Element | Section | Index No. | Issue | Position | Resolution |
---|---|---|---|---|---|---|
Part 1 - General Requirements | No Technical Element | Global | References | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 1 - General Requirements | No Technical Element | Section 1-1 | 1-1.1 thru 1-1.7 | -------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-2 | 1-2.1 | Acronyms | -------------------- | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-2 | COL | Acronym is needed | Clarification | COL: Combined License |
Part 1 - General Requirements | No Technical Element | Section 1-2 | Other acronyms | -------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-2 | 1-2.2 | Definitions | -------------------- | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-2 | Definitions | The NRC has developed a glossary of terms in this RG, which includes definitions of some terms that were derived from PWROG-19027-NP, Revision 2, and that were previously defined in ASME/ANS RA-Sa- 2009. |
Clarification | The NRC endorses the definitions of the following terms, as presented in the glossary of this RG: ~ as-built, as-operated ~ assumption ~ demonstrably conservative ~ PRA maintenance ~ PRA upgrade ~ significant accident sequence ~ significant basic event/contributor All other terms and definitions in Section1-2.2 of ASME/ANS RA-Sa-2009 are endorsed with no objection. |
Part 1 - General Requirements | No Technical Element | Section 1-3 | 1-3.1 thru 1-3.4, 1-3.6 |
-------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-3 | 1-3.5, 2nd paragraph | Use of the word “significant” should match definitions provided in Section 2.2. | Clarification | (b) The difference is not significant if the modeled accident sequences accounting for at least |
Part 1 - General Requirements | No Technical Element | Section 1-3 | Figure 1-3-1 | See staff proposed resolution for Section 1- 1.4.2, text in Box 4 of Figure 1-3.1-1 needs to be modified be consistent with the text. | Clarification | For each relevant Hazard Group, 4 Determine the relative importance to the application, identify the portions of the HG PRA relevant to the application, and for each relevant portion of the hazard group, determine the Capability Category for each SR needed for each potion of PRA to 5 PRA scope and risk metrics sufficient to evaluate plant |
Part 1 - General Requirements | No Technical Element | Section 1-4 | 1-4.1 thru 1- 4.3.2, 1-4.3.4 thru 1-4.5 |
-------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-4 | 1-4.3.3, 2nd paragraph |
The intent of this statement/requirement is for the use of outside expert, as such the use of the word “should” does not provide a minimum requirement. | Clarification | …The PRA analysis team shall |
Part 1 - General Requirements | No Technical Element | Section 1-5 | 1-5.1 thru 1-5.7 | -------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-6 | 1-6.1.1, 1-6.1.2, 1-6.2, 1-6.4, 1-6.5, 1-6.6.2 |
-------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Section 1-6 | 1-6.1 | The purpose, as written, implies that it is solely an audit against the requirements of Section 4. A key objective of the peer review is to ensure when evaluating the PRA against the technical requirements, the “quality” (i.e., strengths and weaknesses) of the PRA; this goal is to be clearly understood by the peer review team. Further, the statement that “the peer review need not assess all aspects of the PRA against all requirements” could be taken to imply that some of the requirements could be skipped. |
Clarification | …another purpose of the peer review is to determine the strengths and weaknesses in the PRA. Therefore, the peer review shall also assess the appropriateness of the assumptions. The peer review need not assess all aspects of the PRA against all requirements in the Technical Requirements Section of each respective Part of this Standard; however, enough aspects of the PRA shall be reviewed for the reviewers to achieve consensus on the assessment of each applicable supporting requirement, as well as on the adequacy of methodologies and their implementation for each PRA Element. |
Part 1 - General Requirements | No Technical Element | Section 1-6 | 1-6.3 | As written, there does not appear to be a minimum set. The requirement as written provides “suggestions.” A minimal set of items is to be provided; the peer reviewers have flexibility in deciding on the scope and level of detail for each of the minimal items. | Clarification | The peer review team shall use the requirements… of this Standard. For each PRA element, a set of review topics required for the peer review team are provided in the subparagraphs of para. 6.3. Additional material for those Elements may be reviewed depending on the results obtained. |
Part 1 - General Requirements | No Technical Element | Section 1-6 | 1-6.6.1 | The specific SRs addressed in the peer review need to be documented. As written it is not clear whether certain essential items are included in the documentation requirements that are necessary to accomplish the goal of the peer review. | Clarification | (e) a discussion of the extent to which each PRA Element was reviewed, including a list of SRs that were reviewed |
Part 1 - General Requirements | No Technical Element | Section 1-7 | References_2 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | Global | The word “significant” is used in many places throughout the Appendix. For example, the term “significant changes in scope or capability” is used to classify a change as a PRA upgrade, rather than a PRA maintenance. The term “significant change in risk insights” is used to indicate when a focused peer review is suggested even for what is nominally classified as a PRA maintenance. While what is meant by the former is clarified in the examples, what constitutes a “significant change in risk insights” needs to be defined and added to the defined terms in Section 1-2. |
Clarification | Add to list of definitions -- Significant change in risk insights: Whether a change is considered significant is dependent on the context in which the insights are used. A change in the risk insights is considered significant when it has the potential to change a decision being made using the PRA. |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.3, Examples 1 thru 7, 9, 11-16, 19, 20, 22 thru |
-------------------- | No objection | -------------------- |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.1, 4th paragraph |
As written, it could be inferred that a newly developed method would not be considered an upgrade. | Clarification | . . . “new” should be interpreted as new to the subject PRA even though the methodology in question has been applied in other PRAs and includes newly developed methods that have been used in the base PRA by the analyst. intended to imply a NDM. |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.2 | An “internal review” is recommended in several places. This recommendation is made instead of an “outside” peer review. It needs to be made clear that this internal review is a type of “peer review” and should follow the process and requirements for the peer review requirements. | Clarification | (d) In the context . . . A focused review would be warranted. (e) When performing an internal review, the objective is to assess that the change to the PRA was correctly performed. In performing this assessment, the reviewer should use as guidance those applicable requirements in the standard. |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.3, Examples 8, 10, 17 |
It is assumed that a change to the base PRA that involves a calculation using the same computer code is a PRA maintenance type change rather than a PRA upgrade type change. This assumption would only be valid if the calculation does not involve any new assumptions and the same analyst is performing the calculation. |
Clarification | Change: . . . . using the same computer code that was used for the prior calculations , given the calculation does not involve any new assumptions and the calculation is performed using the same guidance. NOTE: the words “that was used for the prior calculations” do not appear in Example #8, staff clarification includes these words in Example #8. |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.3, Example 18 |
Changing the definition of core damage without changing the thermal- hydraulic methodology may result in changed success criteria which could change the accident progression delineated by the accident sequences. It is not a foregone conclusion that this is a simple change to the PRA model. It needs to be reviewed to ensure that the resulting changes are appropriate. Further, what would be a significant change is open to interpretation, and “would be prudent” is not as strong as “should.” | Clarification | Discussion and/or Alternative Recommendation: While this change may not be a “new methodology,” it could result in changing the success criteria with implications for the development of accident sequences, and potentially on the HRA (through timing), data, and quantification. If this change leads to a significant change in risk insights, a focused peer review should be performed |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | 1-A.3, Example 21 |
This assumes that the “important” human actions are of the same nature as the new ones being added and utilize the ASEP method in the exact same manner. This cannot be assumed. | Clarification | Rationale: If it can be shown that the previous “important” human actions fully utilized the ASEP method, and that any deficiencies by the analyst were corrected, then, if there is no significant impact on risk insights, this change falls into ....... |
Part 1 - General Requirements | No Technical Element | Appendix 1-A | References_3 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 2 - Internal Events | No Technical Element | Section 2-1 | 2-1.1 thru 2-1.3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | No Technical Element | Section 2-2 | 2-2.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | 2-2.1 – IE | 2-2.1.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | 2-2.1 – IE | Table 2-2.1-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A5 | The search for initiators should go down to the subsystem/train level. Capability Category III should consider the use of “other systematic processes.” |
Clarification | Cat I and II: PERFORM a systematic evaluation of each system and where necessary down to the subsystem or train level, including support systems…. Cat III: PERFORM a systematic evaluation of each system down to the subsystem or train level, including support systems…. PERFORM an FMEA (failure modes and effects analysis) or other systematic process to assess…. |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-A6 | Initiating events from common cause or from both routine and non- routine system alignments should be considered. | Clarification | Cat II: …resulting from multiple failures, if the equipment failures result from a common cause, Cat III: …resulting from multiple failures, including equipment failures resulting from random and common causes, |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-B4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-B5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C13 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C14 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C15 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-C12 | Providing a list of generic data sources would be consistent with other SRs related to data. | Clarification | COMPARE results and EXPLAIN differences in the initiating event analysis with generic data sources to provide a reasonable check of the results. An example of an acceptable generic data sources is NUREG/CR-6928 [Note (1)]. |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | Footnote (1)(a) to Table 2-2.1- 4(c) | The first example makes an assumption that the hourly failure rate is applicable for all operating conditions. | Clarification | …Thus, fbus at power = 1×10-7/hr * 8760 hrs/yr * 0.90 = 7.9×10-4/reactor year. In the above example, it is assumed the bus failure rate is applicable for at- power conditions. It should be noted that initiating event frequencies may be variable from one operating state to another due to various factors. In such cases, the contribution from events occurring only during at-power conditions should be utilized. |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-D1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-D2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | IE - Initiating Event Analysis | Tables 2-2.1-2(a) thru 2-2.1-5(d) | IE-D3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | 2-2.2 – AS | 2-2.2.1 | The HLR and associated SRs are written for CDF and not LERF; therefore, references to LERF are not appropriate. | Clarification | 2-2.2.1 Objectives. The objectives… reflected in the assessment of CDF |
Part 2 - Internal Events | AS - Accident Sequence Analysis | 2-2.2 – AS | Table 2-2.2-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-A9 | The code requirements for acceptability need to be stated. | Clarification | Cat II and III: …affect the operability of the mitigating systems. (See SC-B4.) |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-B7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | AS - Accident Sequence Analysis | Tables 2-2.2-2(a) thru 2-2.2-4(c) | AS-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | 2-2.3 – SC | 2-2.3.1 | The HLR and associated SRs are written for CDF and not LERF; therefore, references to LERF are not appropriate. | Clarification | (a) overall success criteria are defined (i.e., core damage |
Part 2 - Internal Events | SC - Success Criteria | 2-2.3 – SC | Table 2-2.3-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A1 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A2 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A3 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A4 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A5 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-A6 | Note: SC-A3 was deleted in Addendum B. | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-B4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-B5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SC - Success Criteria | Tables 2-2.3-2(a) thru 2-2.3-4(c) | SC-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | 2-2.4 – SY | 2-2.4.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | 2-2.4 – SY | Table 2-2.4-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A12 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A13 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A14 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A15 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A16 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A17 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A18 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A19 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A20 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A21 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A22 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A23 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-A24 | There are no commonly used analysis methods for recovery in the sense of repair, other than use of actuarial data. | Clarification | …is justified through an adequate analysis or examination of data collected in accordance with DA-C15 and estimated in accordance with DA-D9. |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B12 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B13 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B15 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-B14 | Containment vent and failure can cause more than NPSH problems (e.g., harsh environments). | Clarification | Examples of degraded environments include: (h) harsh environments induced by containment venting, failure of the containment venting ducts, or failure of the containment boundary that may occur prior to the onset of core damage |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | SY - Systems Analysis | Tables 2-2.4-2(a) thru 2-2.4-4(c) | SY-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | 2-2.5 – HR | 2-2.5.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | 2-2.5 – HR | Table 2-2.5-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D3 | Add examples for what is meant by quality in items (a) and (b) of Cat II, III. |
Clarification | Cat II, III: (a) the quality (e.g., format, logical structure, ease of use, clarity, and comprehensiveness) of written procedures (for performing tasks) and the type of administrative controls that support independent review (e.g., configuration control process, technical review process, training processes, and management emphasis on adherence to procedures). (b) the quality of the human-machine interface (e.g., adherence to human factors guidelines [Note (3)] and results of any quantitative evaluations of performance per functional requirements), including both the equipment configuration, and instrumentation and control layout (3) NUREG-0700, Rev. 2, Human- System Interface Design Review Guidelines; J.M. O’Hara, W.S. Brown, P.M. Lewis, and J.J. Persensky, May 2002. |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-D6 | This SR should be written similarly to HR-G9 | Clarification | uncertainty in the estimates of the HEPs consistent with the quantification approach, and PROVIDE mean values for use in the quantification of the PRA results. |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-E1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-E2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-E3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-E4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-F1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-F2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G3 | In item (d) of CC II, III, clarify that “clarity” refers the meaning of the cues, etc. In item (a) of CC I and item (g) of CC II, III, clarify that complexity refers to both determining the need for and executing the required response. |
Clarification | Cat I: … (a) the complexity of detection, diagnosis, decision-making and executing the required response (b) … Cat II, and III: (d) degree of clarity of the cues/indications in supporting the detection, diagnosis, and decision-making give the plant- specific and scenario-specific context of the event. (g) complexity of detection, diagnosis and decision-making, and executing the required response. |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G4 | Requirements concerning the use of thermal/hydraulic codes should be cross- referenced. | Clarification | Cat I, II, and III: BASE…. (See SC-B4.) SPECIFY the point in time…. |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-G8 | Action verb should be capitalized | Clarification | CHARACTERIZE |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-H1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-H2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-H3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-I1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-I2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | HR - Human Reliability Analysis | Tables 2-2.5-2(a) thru 2-2.5-10(i) | HR-I3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | 2-2.6 - DA | 2-2.6.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | 2-2.6 - DA | Table 2-2.6-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C12 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C13 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C14 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C16 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-C15 | This SR provides a justification for crediting equipment repair (SY- A24). As written, it could be interpreted as allowing plant-specific data to be discounted in favor of industry data. In reality, for such components as pumps, plant-specific data is likely to be insufficient and a broader base is necessary. | Qualification | …IDENTIFY instances of plant-specific experience |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D1 | Other approved statistical processes for combining plant-specific and generic data are not available. | Clarification | CC II and III: …USE a Bayes update process |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-D9 | New requirement needed, DA-C15 was incomplete, only provided for data collection, not quantification of repair. (See SY-A24.) | Qualification | Cat I, II, and III: For each SSC for which repair is to be modeled, ESTIMATE, based on the data collected in DA-C15, the probability of failure to repair the SSC in time to prevent core damage as a function of the accident sequence in which the SSC failure appears. |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-E1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-E2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | DA - Data Analysis | Tables 2-2.6-2(a) thru 2-2.6-6(e) | DA-E3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | 2-2.7.1 | SRs for LERF quantification reference the SRs in 2-2.8, and therefore, need to be acknowledged in 2-2.8. | Clarification | The objectives of the quantification element are to provide an estimate of CDF (and support the quantification of LERF) based upon the plant-specific… (b) significant contributors to CDF (and LERF) are identified such as initiating events… |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-A | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-B | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-C | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-E | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-F | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | 2-2.7 - QU | HLR-QU-D | SRs for LERF quantification reference the SRs in 2-2.8 and, therefore, need to be acknowledged in 2-2.8. | Clarification | …significant contributors to CDF (and LERF), such as initiating events, accident sequences… |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-A5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-A2 | Need to acknowledge LERF quantification | Clarification | …consistent with the estimation of total CDF (and LERF) to identify significant accident… |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-A3 | The state-of-knowledge correlation should be accounted for all event probabilities. Left to the analyst to determine the extent of the events to be correlated. Need to also acknowledge LERF quantification | Clarification | Cat I: ESTIMATE the point estimate CDF (and LERF) Cat II: ESTIMATE the mean CDF (and LERF), accounting for the “state-of-knowledge” correlation between event probabilities Cat III: CALCULATE the mean CDF (and LERF) by … |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-B6 | Need to acknowledge LERF quantification | Clarification | ACCOUNT for … realistic estimation of CDF or LERF. This accounting … |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | Table 2-2.7-5(d) | HLR-QU-D and Table 2- 2.7-2(d) objective statement just before table need to agree; SRs for LERF quantification reference the SRs in 2-2.7 and, therefore, need to be acknowledged in 2-2.7. | Clarification | …significant contributors to CDF (and LERF), such as initiating events, accident sequences… |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-D7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-E1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-E2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-E3 | Need to acknowledge LERF quantification | Clarification | Cat I and II: ESTIMATE the uncertainty interval of the CDF (and LERF) results. |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-E4 | The note has no relevance to the base model and could cause confusion; it should be deleted. | Clarification | For each source of model uncertainty … introduction of a new initiating event) NOTE: For specific applications, … And in logical combinations. |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | QU - Quantification | Tables 2-2.7-2(a) thru 2-2.7-7(f) | QU-F2 | SR needs to use defined term “significant” instead of “dominant.” In addition, there is no requirement to perform sensitivity studies, and therefore, requirement is not needed for documentation. | Clarification | (g) equipment or human actions that are the key factors in causing the accidents sequences to be |
Part 2 - Internal Events | LE - LERF Analysis | 2-2.8 – LE | 2-2.8.1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | 2-2.8 – LE | Table 2-2.8-1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-A1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-A2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-A3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-A4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-A5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-B1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-B2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-B3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C8 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C10 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C11 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C12 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-C13 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-D7 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-E1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-E2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-E3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-E4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-F1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-F2 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-F3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G1 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G3 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G4 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G5 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G6 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | LE - LERF Analysis | Tables 2-2.8-2(a) thru 2-2.8-8(g) | LE-G2 | There is no requirement to perform sensitivity studies. | Clarification | (h) the model integration … quantification |
Part 2 - Internal Events | No Technical Element | Tables 2-2.8-2(a) thru 2-2.8-8(g) | Table 2-2.8-9 | -------------------- | No objection | -------------------- |
Part 2 - Internal Events | No Technical Element | Section 2-3 | 2-3.1 thru 2-3.3.8.2 |
-------------------- | No objection | -------------------- |
Part 2 - Internal Events | No Technical Element | Section 2-4 | References_4 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 3 - Internal Flood | No Technical Element | Section 3-1 | 3-1.1 thru 3-1.3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | No Technical Element | Section 3-2 | 3--2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | 3-2.1 – IFPP | 3-2.1.1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | 3-2.1 – IFPP | Table 3-2.1-1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-A1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-A2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-A3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-A4 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-A5 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-B1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-B2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFPP - Internal Flood Plant Partitioning | Tables 3-2.1-2(a) thru 3-2.1-3(b) | IFPP-B3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | 3-2.2 – IFSO | 3-2.2.1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | 3-2.2 – IFSO | Table 3-2.2-1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A4 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A6 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A1 | The list of fluid systems should be expanded to include fire protection systems. | Clarification | For each flood area ... INCLUDE: (a) equipment (e.g., piping, valves, pumps) located in the area that are connected to fluid systems (e.g., circulating water system, service water system, … |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-A5 | It is necessary to consider a range of flow rates for identified flooding sources, each having a unique frequency of occurrence. For example, small leaks that only cause spray are more likely than large leaks that may cause equipment submergence. | Clarification | (b) range of flow rates |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-B1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-B2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSO - Internal Flood Source Identification and Characterization | Tables 3-2.2-2(a) thru 3-2.2-3(b) | IFSO-B3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | 3-2.3 – IFSN | 3-2.3.1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | 3-2.3 – IFSN | Table 3-2.3-1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A4 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A5 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A7 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A8 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A9 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A10 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A11 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A12 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A13 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A14 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A15 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A16 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A17 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-A6 | For Cat II, it is not acceptable to just note that a flood-induced failure mechanism is not included in the scope of the internal flooding analysis. Some level of assessment is required. | Qualification | Cat I: For the SSCs identified in IFSN-A5, IDENTIFY the susceptibility of each SSC in a flood area to flood-induced failure mechanisms. INCLUDE failure by submergence and spray in the identification process. EITHER: (a) ASSESS… by using conservative assumptions; OR (b) NOTE that these mechanisms are not included in the scope of the evaluation. Cat II: For the SSCs identified in IFSN-A5, IDENTIFY the susceptibility of each SSC in a flood area to flood-induced failure mechanisms. INCLUDE failure by submergence and spray in the identification process. ASSESS qualitatively the impact of flood-induced mechanisms that are not formally addressed (e.g., using the mechanisms listed under Capability Category III of this requirement), by using conservative assumptions. |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-B1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-B2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFSN - Internal Flood Scenario Development | Tables 3-2.3-2(a) thru 3-2.3-3(b) | IFSN-B3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | 3-2.4 – IFEV | 3-2.4.1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | 3-2.4 – IFEV | Table 3-2.4-1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A4 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A5 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A6 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A7 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-A8 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-B1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-B2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFEV - Internal Flood Initiating Event Analysis | Tables 3-2.4-2(a) thru 3-2.4-3(b) | IFEV-B3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | 3-2.5 – IFQU | 3-2.5.1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | 3-2.5 – IFQU | Table 3-2.5-1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A4 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A5 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A6 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A7 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A9 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A10 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A11 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-A8 | The quantification also needs to include the effect of common-cause failure. | Clarification | INCLUDE, in the quantification, the combined effects of … including equipment failures, unavailability due to maintenance, common-cause failures and other credible causes. |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-B1 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-B2 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | IFQU - Internal Flood Quantification | Tables 3-2.5-2(a) thru 3-2.5-3(b) | IFQU-B3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | No Technical Element | Section 3-3 | 3-3.1 thru 3-3.3 | -------------------- | No objection | -------------------- |
Part 3 - Internal Flood | No Technical Element | Section 3-4 | References_5 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 4 - Internal Fire | No Technical Element | Section 4-1 | 4-1.1 thru 4-1.6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | 1.1.1.1.1.1.1 Section 4-2 | 4--2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | 4-2.1 – PP | 4-2.1.1, 4-2.1.2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | 4-2.1 – PP | Table 4-2.1-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-B7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-C2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-C3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PP - Internal Fire Plant Partitioning | Tables 4-2.1-2(a) thru 4-2.1-4(c) | PP-C4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | 4-2.2 – ES | 4-2.2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | 4-2.2 – ES | HLR-ES-A | Grammatical change for clarity | Clarification | ...identify equipment whose failure, including spurious operation, caused by an initiating fire, |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | HLR-ES-A_2 | Conforming change to HLR-ES-A |
Clarification | ...identify equipment whose failure, including spurious operation, caused by an initiating fire, |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-A1 | Conforming change to HLR-ES-A | Clarification | IDENTIFY equipment whose failure, including spurious operation, caused by an initiating fire, |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-B5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-B1 | The notes states this requirement is a starting point for selection of mitigating equipment, and that an iterative process will provide the completeness with respect to Table 1-1.3-1, which specifies that the significant contributors be included in the model. The requirement should represent the end result, not the beginning point. Although the definition of failure mode in Part 1 includes spurious operation, it is worth explicitly including since it is an important issue. |
Qualification | Cat II: IDENTIFY Fire … and INCLUDE fire risk-significant equipment NOTE-ES-B1-7: The gradation across … the Fire PRA (other equipment can be assumed failed in the worst possible failure mode , including spurious operation). This will tend … |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-B4 | SR refers to incorrect SR | Clarification | … equipment identification per SRs ES- B1 through ES-B3 |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-C1 | There is a concern with the way in which the term “significant’ has been used. It is ambiguous as to whether the reference is to the total CDF, the internal events CDF, or the fire CDF. In order to avoid ambiguity, it is necessary to have a definition of the term “significant.” The terms “significant accident sequence,” “significant accident progression sequence,” “significant basic event,” “significant cutset,” and “significant contributor” are defined in Part 1 within the context of the hazard group, so that in Part 3, they should be interpreted as being measured with respect to the fire risk. | Clarification | NOTE-ES-C1-3: … is not a significant contributor (as defined in Part 1), … |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-C2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | ES - Internal Fire Equipment Selection | Tables 4-2.2-2(a) thru 4-2.2.5(d) | ES-D1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | 4-2.3 – CS | 4-2.3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | 4-2.3 – CS | Table 4-2.3-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A11 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-A10 | PP-B1 already allows physical analysis units to be defined in terms of fire areas. As such the distinction between CCI and CCII is unnecessary. | Clarification | IDENTIFY … and CONFIRM … terminal end locations. Cat I and II: IDENTIFY the physical analysis units, consistent with the plant partitioning analysis, through which each cable associated with a credited Fire PRA function passes and CONFIRM that the information includes treatment of cable terminal end locations. |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-C2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-C3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CS - Internal Fire Cable Selection | Tables 4-2.3-2(a) thru 4-2.3-4(c) | CS-C4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | 4-2.4 – QLS | 4-2.4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | 4-2.4 – QLS | Table 4-2.4-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QLS - Internal Fire Qualitative Screening | Tables 4-2.4-2(a) thru 4-2.4-3(b) | QLS-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | 4-2.5 – PRM | 4-2.5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | 4-2.5 – PRM | Table 4-2.5-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B10 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B11 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B12 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B13 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B14 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-B15 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | PRM - Internal Fire Plant Response Model | Tables 4-2.5-2(a) thru 4-2.5-4(c) | PRM-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | 4-2.6 – FSS | 4-2.6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | 4-2.6 – FSS | Table 4-2.6-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A2 | Need to clarify that spurious operation is a failure mode. | Clarification | …For each target set, SPECIFY …including specification of the failure modes , including spurious operation. |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A4 | Use of language, “one or more,” is problematic, since it does not specify a minimum requirement. | Clarification | IDENTIFY sufficient |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-A5 | The number of individual fire scenarios and level of detail should be commensurate with the relative risk importance of the physical analysis unit. | Clarification | Cat I and II: For each unscreened … can be characterized commensurate with its risk significance. NOTE FSS-A5-5: It is expected … will be commensurate with |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-C2 | See Issue for ES-C1 | Clarification | Cat II and III: For those scenarios that represent significant contributors to … NOTE FSS-C3-3: … are not significant contributors (as defined in Part 1), … |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D10 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D11 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-D3 | Again the “either bounded or accurately characterized” issue for CC II and CC III. | Clarification | Cat I: …in the analysis of each fire scenario such that the fire risk contribution of each unscreened physical analysis unit is bounded. Cat II: …the fire risk contribution of each unscreened physical analysis unit can be Cat III: …the fire risk contribution of each unscreened physical analysis unit can be |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-E1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-E2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-E3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-E4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-F1 | Use of the term “SELECT one or more” | Clarification | Cat II and II: …SELECT |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-F2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-F3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-G6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FSS - Internal Fire Scenario Selection | Tables 4-2.6-2(a) thru 4-2.6-9(h) | FSS-H10 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | 4-2.7 – IGN | 4-2.7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | 4-2.7 – IGN | Table 4-2.7-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A1 | The note, IGN-A1-1, appears to be more relevant to IGN-A2 than it is for IGN-A1. Item (e) only makes sense when there is equivalent nuclear experience. | Clarification | NOTE IGN-A1-1…(e) if being used as a supplement to, rather than in lieu of, nuclear data, that the fire frequencies calculated are consistent with those derived from nuclear experience ; … |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A6 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A7 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-A10 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-B4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | IGN - Internal Fire Ignition Frequency | Tables 4-2.7-2(a) thru 4-2.7-3(b) | IGN-B5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | 4-2.8 – QNS | 4-2.8 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | 4-2.8 – QNS | Table 4-2.8-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-C1 | The screening criteria in Capability Categories II and III should relate to the total CDF and LERF for the fire risk, not the internal events risk. See Issue for 4-2.2-2(c). NOTE ES-C1 |
Clarification | Cat II: …and ~ the sum of the CDF contribution for all screened fire compartments is <10% of the estimated total CDF for and ~ the sum of the LERF contributions for all screened fire compartments is <10% of the estimated total LERF for Cat III: …and ~ the sum of the CDF contributions for all screened fire compartments is <1% of the estimated total CDF for and ~ the sum of the LERF contributions for all screened fire compartments is <1% of the estimated total LERF for |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-D1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | QNS - Quantitative Screening | Tables 4-2.8-2(a) thru 4-2.8-5(d) | QNS-D2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CF - Circuit Failure Analysis | 4-2.9 – CF | 4-2.9 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CF - Circuit Failure Analysis | 4-2.9 – CF | Table 4-2.9-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CF - Circuit Failure Analysis | Tables 4-2.9-2(a) thru 4-2.9-5(d) | CF-A1 | See Issue for ES-C1 | Clarification | NOTE CF-A1-1: … for non-risk significant contributors (as defined in Part 1), … |
Part 4 - Internal Fire | CF - Circuit Failure Analysis | Tables 4-2.9-2(a) thru 4-2.9-5(d) | CF-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | CF - Circuit Failure Analysis | Tables 4-2.9-2(a) thru 4-2.9-5(d) | CF-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | 4-2.10 – HRA | 4-2.10 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | 4-2.10 – HRA | Table 4-2.10-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-B2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-B3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-B4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-D1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-D2 | This SR has the same index number as the previous SR. | Clarification | HRA-D |
Part 4 - Internal Fire | HRA - Post-fire Human Reliability Analysis | Tables 4-2.10-2(a) thru 4-2.10-6(e) | HRA-E1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | 4-2.11 – SF | 4-2.11 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | 4-2.11 – SF | Table 4-2.11-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-A5 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | SF - Seismic/Fire Interactions | Tables 4-2.11-2(a) thru 4-2.11-3(e) | SF-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | 4-2.12 – FQ | 4-2.12 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | 4-2.12 – FQ | HLR-FQ-E | See Issue for ES-C1 | Clarification | HLR-FQ-E: … and significant contributors (as defined in Part 1) to CDF and LERF … |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-A3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-A4 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-B1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-C1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-D1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-E1 | See Issue for ES-C1 | Clarification | IDENTIFY significant contributors (as defined in Part 1) … |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-F1 | See Issue for ES-C1 | Clarification | DOCUMENT the CDF and LERF … ~ SRs QU-F2 and QU-F3 … are significant contributors (as defined in Part 1); … |
Part 4 - Internal Fire | FQ - Internal Fire Quantification | Tables 4-2.12-2(a) thru 4-2.12-7(f) | FQ-F2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | 4-2.13 -- UNC | 4-2.13 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | 4-2.13 -- UNC | Table 4-2.13-1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Table 4-2.13-1 | UNC-A1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Table 4-2.13-1 | UNC-A2 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Section 4-3 | 4-3.1 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Section 4-3 | 4-3.2 | Expertise in Fire HRA is needed for the peer review | Clarification | …fire modeling, |
Part 4 - Internal Fire | No Technical Element | Section 4-3 | 4-3.3 | -------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Section 4-3 | 4-3.3.1 thru 4-3.3.13 |
-------------------- | No objection | -------------------- |
Part 4 - Internal Fire | No Technical Element | Section 4-4 | References_6 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 4 - Internal Fire | No Technical Element | Section 4-4 | Fire NMA | -------------------- | The staff does not endorse the material in this appendix, and as such, does not have a position (i.e., no objections, no objection with clarification, or no objection with qualification) on any of the material contained in this appendix. However, it should be noted, that consistent with the Commission-endorsed phase PRA Quality Initiative, all risk contributors that cannot be shown as insignificant, should be assessed through quantitative risk assessment methods to support risk informed licensing actions. | -------------------- |
Part 5 - Seismic Events | No Technical Element | Section 5-1 | 5--1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | No Technical Element | Section 5-2 | 5--2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | 5-2.1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-A | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-B | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-C | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-D | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-E | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-F | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-J | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-G | Much of the HLR is more how to meet the HLR and should be a SR. Further, the SRs provide the requirements needed in order to meet the HLR. This relationship does not exist here. In addition, this information is also duplicated in the accompanying note. At the least, this text should be removed from the HLR. |
Clarification | For further use in the SPRA, the spectral shape SHALL be based on a site-specific evaluation taking into account the contributions of deaggregated magnitude-distance results of the probabilistic seismic hazard analysis. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-H | Much of the HLR is more how to meet the HLR and should be a SR. Further, the SRs provide the requirements needed in order to meet the HLR. This relationship does not exist here. |
Clarification | |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | 5-2.1 – SHA | HLR-SHA-I | Much of the HLR is more how to meet the HLR and should be a SR. Further, the SRs provide the requirements needed in order to meet the HLR. This relationship does not exist here. |
Clarification | |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-A1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-A2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-A3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-A4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-A5 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-B1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-B2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-B3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-C1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-C2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-C3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-C4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-D1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-D2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-D3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-D4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-E1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-E2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-F1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-F2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-F3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | Table 5-2.1-8(g) | See issue for Table 5- 2.1-1, HLR-SHA-G | Clarification | For further use in the SPRA, the spectral shape SHALL be based on a site-specific evaluation taking into account the contributions of deaggregated magnitude-distance results of the probabilistic seismic hazard analysis. spectral shapes. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-G1 | Spectral shapes used to evaluate in-structure SSC’s must include the effects of amplification from both local site conditions and SSI. Based on IPEEE reviews, certain UHS shapes used for CEUS were not appropriate for the screening purpose. |
Clarification | NOTE HA-G1: The issue of which spectral shape should be used in the screening of structures, systems, and components (SSCs) and in quantification of SPRA results requires careful consideration. For screening purposes, the spectral shape used should have amplification factors , including effects from both local site conditions as well as soil- structure interaction, such that the demand resulting from the use of this shape is higher than that based on the design spectra. This will preclude premature screening of components and will avoid anomalies such as the screened components (e.g., surrogate elements) being the components. Additional discussion on this issue can be found in Ref. 30. In the quantification of fragilities and of final risk results, it is important to use as realistic a shape as possible. Semi-site specific shapes, such as those given in NUREG-0098, have been used in the past and |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | Table 5-2.1- 9(h) | See issue for Table 5- 2.1-1, HLR-SHA-H | Clarification | study are valid. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-H1 | See issue for Table 5- 2.1-1, HLR-SHA-H | Clarification | SHA-H1 Cat I and II: meets the requirements in HLR- SHA-A thru HLR-SHA-G. Cat III: DO NOT USE existing studies. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | Table 5-2.1- 10(i) | See issue for Table 5- 2.1-1, HLR-SHA-I | Clarification | vibratory ground motion if necessary. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-I1 | See issue for Table 5- 2.1-1, HLR-SHA-I | Clarification | There are no supporting requirements here. SHA-I1 Cat I, II and III: PERFORM a screening to determine whether to include other seismic hazards such as fault displacement, landslide, soil liquefaction, or soil settlement in the seismic PRA. 1.1.1.1.1.1.2 SHA-I2 Cat I, II and III: ADDRESS the effect of these other seismic hazards through assessment of the frequency of hazard occurrence or the magnitude of hazard consequences, or both. |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-J1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-J2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SHA - Seismic Hazard Analysis | Tables 5-2.1-2(a) to 5-2.1-10(j) | SHA-J3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | 5-2.2 – SFR | 5-2.2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | 5-2.2 – SFR | 5-2.2 Table 5-2.2-1 |
-------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-A1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-A2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-B1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-B2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C5 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-C6 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-D1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-D2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-E1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-E2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-E3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-E4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-E5 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-F1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-F2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-F3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-F4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-G1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-G2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SFR - Seismic Fragility Analysis | Table 5-2.2-2(a) thru 5-2.2-8(g) | SFR-G3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | 5-2.3 – SPR | 5-2.3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | 5-2.3 – SPR | 5-2.3 Table 5-2.3-1 |
-------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-A1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-A2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-A3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-A4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B5 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B6 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B7 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B8 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B9 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B10 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-B11 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-C1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-D1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E4 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E5 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-E6 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-F1 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-F2 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | SPR - Seismic Plant Response Analysis | Tables 5-2.3-2(a) thru 5-2.3-7(f) | SPR-F3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | No Technical Element | Section 5-3 | 5--3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | No Technical Element | Section 5-4 | References_7 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 5 - Seismic Events | No Technical Element | Appendix 5-A | 5-A.1 thru 5- A.3 | -------------------- | No objection | -------------------- |
Part 5 - Seismic Events | No Technical Element | Appendix 5-A | References_8 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 6 - Hazard Screening | No Technical Element | Section 6-1 | 6--1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | No Technical Element | Section 6-2 | 6-2.1 thru 6-2.3 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | No Technical Element | Section 6-2 | Table 6-2-1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-A1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-A2 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-B1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-B2 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-B3 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-B4 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C2 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C3 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C4 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C5 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C6 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-C7 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-D1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-D2 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-E1 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | EXT - Screening and Conservative Analysis of Hazards | Tables 6-2-2(a) to 6-2-6(e) | EXT-E2 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | No Technical Element | Section 6-3 | 6-3.1 thru 6-3.3 | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | No Technical Element | Section 6-4 | References_9 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 6 - Hazard Screening | No Technical Element | Appendix 6-A | Appendix 6-A | -------------------- | No objection | -------------------- |
Part 6 - Hazard Screening | No Technical Element | Appendix 6-A | References_10 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 7 - High Wind | No Technical Element | 1.1.1.1.1.1.3 Section 7-1 | 7--1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | No Technical Element | Section 7-2 | 7--2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | 7-2.1 – WHA | 7-2.1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | 7-2.1 – WHA | Table 7-2.1-1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-A1 | The six elements described in NOTE WIND-A1 provide the details required for the tornado wind hazard analysis and should be included in WIND-A1 as requirements. | Qualification | Cat II and III: In the tornado wind hazard analysis, USE … a mean hazard curve can be derived. INCLUDE the following elements in the tornado wind hazard analysis: (1) Variation of tornado intensity with occurrence frequency (The frequency of tornado occurrence decreases rapidly with increased Intensity); (2) Correlation of tornado width and length of damage area; longer tornadoes are usually wider; (3) Correlation of tornado area and intensity; stronger tornadoes are usually larger than weaker tornadoes; (4) Variation in tornado intensity along the damage path length; tornado intensity varies throughout its life cycle; (5) Variation of tornado intensity across the tornado path width. (6) Variation of tornado differential pressure across the tornado path width. NOTE WIND-A1: State-of-the-art methodologies are given ... can be found in Refs. 13, 56, and 57. (a) variation of tornado intensity with occurrence … (f) variation of tornado differential pressure across the tornado path width. |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-A2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-A3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-A4 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-A5 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-B1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-B2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WHA - Wind Hazard Analysis | Tables 7-2.1-2(a) and 7-2.1-2(b) | WHA-B3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | 7-2.2 – WFR | 7-2.2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | 7-2.2 – WFR | Table 7-2.2-1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | Tables 7-2.2-2(a thru 7-2.2-3(b)) | WFR-A1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | Tables 7-2.2-2(a thru 7-2.2-3(b)) | WFR-A2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | Tables 7-2.2-2(a thru 7-2.2-3(b)) | WFR-B1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | Tables 7-2.2-2(a thru 7-2.2-3(b)) | WFR-B2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WFR - Wind Fragility Analysis | Tables 7-2.2-2(a thru 7-2.2-3(b)) | WFR-B3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | 7-2.3 – WPR | 7-2.3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | 7-2.3 – WPR | HLR-WPR-A | The word ‘significant’ should be added in this HLR in Table 7-2.3 and in the HLR statement in Table 7-2.3-2(a) | Clarification | The wind-PRA systems model shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 7 - High Wind | WPR - Wind Plant Response | 7-2.3 – WPR | HLR-WPR-B | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | 7-2.3 – WPR | HLR-WPR-C | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | Table 7-2.3- 2(a) | The word ‘significant’ should be added in the HLR statement in Table 7-2.3-2(a) | Clarification | The wind-PRA systems model shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A4 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A5 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A6 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A7 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A8 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A9 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A10 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-A11 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-B1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-B2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-C1 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-C2 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | WPR - Wind Plant Response | Tables 7-2.3-2(a) thru 7-2.3-4(c) | WPR-C3 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | No Technical Element | Section 7-3 | 7-3 thru 7-3.3.5 | -------------------- | No objection | -------------------- |
Part 7 - High Wind | No Technical Element | Section 7-4 | References_11 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 8 - External Flood | No Technical Element | Section 8-1 | 8--1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | No Technical Element | Section 8-2 | 8--2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | 8-2.1 – XFHA | Table 8-2.1-1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | Table 8-2-2(a) | Incorrect table number | Clarification | Table |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A4 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A5 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-A6 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-B1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-B2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFHA - External Flood Hazard Analysis | Tables 8-2-2(a) and 8-2.1-3(b) | XFHA-B3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | 8-2.2 – XFFR | Table 8-2.2-1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | Table 8-2-2(a)_2 | Incorrect table number | Clarification | Table |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | XFFR-A1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | XFFR-A2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | XFFR-B1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | XFFR-B2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFFR - External Flood Fragility Analysis | Tables 8-2-2(a) and 8-2.2-3(b) | XFFR-B3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | 8-2.3 | 8-2.3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | 8-2.3 | HLR-XFPR-A | The word ‘significant’ needs to be added in this HLR in Table 8-2.3 and in the HLR statement in Table 8-2.3-2(a) |
Clarification | The external flooding-PRA systems model shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | Table 8-2.3- 2(a) | The word ‘significant’ needs to be added the HLR statement in Table 8-2.3-2(a) | Clarification | The external flooding-PRA systems model shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A4 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A5 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A6 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A7 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A8 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A9 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A10 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-A11 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-B1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-B2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-C1 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-C2 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | XFPR - External Flood Plant Response | Tables 8-2.3-2(a) and 8-2.3-4(c) | XFPR-C3 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | No Technical Element | Section 8-3 | 8-3 thru 8-3.3.5 | -------------------- | No objection | -------------------- |
Part 8 - External Flood | No Technical Element | Section 8-4 | References_12 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 9 - Other Hazards | No Technical Element | 1.1.1.1.1.1.4 Section 9-1 | 9--1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | No Technical Element | Section 9-2 | 9--2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | 9-2.1 – XHA | Table 9-2.1-1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-A1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-A2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-A3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-A4 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-B1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-B2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XHA - Other Hazard Analysis | Tables 9-2.1-2(a) and 9-2.1-3(b) | XHA-B3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | 9-2.2 – XFR | Table 9-2.2-1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-A1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-A2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-A3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-A4 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-B1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-B2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XFR - Other Hazard Fragility Analysis | Tables 9-2.2-2(a) and 9-2.2-3(b) | XFR-B3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | 9-2.3 – XPR | 9-2.3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | 9-2.3 – XPR | HLR-XPR-A | The word ‘significant’ should be added in this HLR in Table 9-2.3-1 and in the HLR statement in Table 9-2.3- 2(a) | Clarification | The external hazard PRA plant model shall include wind-caused significant initiating events and other failures that are significant contributors that can … shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | Table 9-2.3- 2(a) | The word ‘significant’ should be added in the HLR statement in Table 9-2.3-2(a) |
Clarification | The external hazard PRA plant model shall include wind-caused significant initiating events and other failures that are significant contributors that can … |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A4 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A5 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A6 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A7 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A8 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A9 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A10 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-A11 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-B1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-B2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-C1 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-C2 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | XPR - Other Hazard Plant Response | Tables 9-2.3-2(a) and 9-2.3-4(c) | XPR-C3 | -------------------- | No objection | -------------------- |
Part 9 - Other Hazards | No Technical Element | Section 9-3 | 9-3.1 thru 9- 3.4.5 |
-------------------- | No objection | -------------------- |
Part 9 - Other Hazards | No Technical Element | Section 9-4 | References_13 | Use of references: the various references, may be acceptable, in general; however, the staff has not reviewed the references, and there may be aspects that are not applicable or not acceptable. |
Clarification | For every reference cited in the standard (except NEI 00-02): No staff position is provided on this reference. The staff neither approves nor disapproves of information contained in the referenced document. |
Part 9 - Other Hazards | No Technical Element | Section 9-4 | Peer Review for SM | -------------------- | The staff does not endorse the material in this Part of the standard, and as such, does not have a position (i.e., no objections, no objection with clarification, or no objection with qualification) on any of the material contained in Part 10 of the standard. However, it should be noted, that consistent with the Commission-endorsed phased PRA Quality Initiative, all risk contributors that cannot be shown as insignificant, should be assessed using a PRA (as defined in regulatory position C.1) to support risk-informed licensing actions. |
-------------------- |
Part/Section | Technical Element | Section | Index No. | Issue | Position | Resolution |