AC |
Alternating Current |
ADS |
Automatic Depressurization System |
AEF |
Annual Exceedance Frequency |
ALWR |
Advanced Light Water Reactor |
ANS |
American Nuclear Society |
AOPs |
Abnormal Operating Procedures |
AOT |
Allowed Outage Time |
APC |
Atmospheric Pressure Change |
ASCE |
American Society Of Civil Engineers |
ASEP |
Accident Sequence Evaluation Program |
ASME |
American Society Of Mechanical Engineers |
ASTM |
American Society For Testing And Materials |
ATHEANA |
A Technique For Human Event Analysis |
ATWS |
Anticipated Transient Without Scram |
BDD |
Binary Decision Diagram |
BOP |
Balance Of Plant |
BWR |
Boiling-Water Reactor |
C&C |
Components And Cladding |
CBDT |
Cognitive-Based Decision Tree |
CCDF |
Complementary Cumulative Distribution Function |
CCDP |
Conditional Core Damage Probability |
CCF |
Common Cause Failure |
CC-I/CC-II |
Capability Categories I And II |
CCW |
Component Cooling Water |
CDF |
Core Damage Frequency |
CDFM |
Conservative Deterministic Failure Margin |
CEUS |
Central And Eastern United States |
CF |
Circuit Failure Analysis (Internal Fire Technical Element) |
CFD |
Computational Fluid Dynamics |
CFR |
U.S. Code Of Federal Regulations |
CLERF |
Conditional Large Early Release Probability |
CS |
Cable Selection And Location (Internal Fire Technical Element) |
CT |
Cooling Tower |
DC |
Direct Current |
DCF |
Dose Conversion Factor |
DHR |
Decay Heat Removal |
DOE |
Us Department Of Energy |
DW |
Drywell |
EAB |
Exclusion Area Boundary |
ECCS |
Emergency Core Cooling System |
EDG |
Emergency Diesel Generator |
EOPs |
Emergency Operating Procedures |
EPIX |
Equipment Performance And Information Exchange System |
EPRI |
Electric Power Research Institute |
EPZ |
Emergency Planning Zone |
ES |
Initiating Events And Equipment Selection (Internal Fire Technical Element) |
FAQ |
Frequently Asked Question |
F-C |
Frequency Consequence |
FEG |
Functional Equipment Group |
FHR |
Fire Human Reliability Analysis (Internal Fire Technical Element) |
FMEA |
Failure Modes And Effects Analysis |
FQ |
Fire Risk Quantification (Internal Fire Technical Element) |
FSAR |
Final Safety Analysis Report |
FSS |
Fire Scenario Selection And Analysis (Internal Fire Technical Element) |
FV |
Fussell-Vesely |
GIP |
Generic Implementation Procedure |
GMC |
Ground Motion Characterization |
GMM |
Ground-Motion Model |
GMPE |
Ground Motion Prediction Equation |
GRS |
Ground Response Spectra |
HAZOPS |
Hazards And Operability Study |
HCLPF |
High Confidence Of A Low Probability Of Failure |
HCR/ORE |
Human Cognitive Reliability/Operator Reliability Experiment |
HEAF |
High Energy Arcing Fault |
HELB |
High Energy Line Break |
HEP |
Human Error Probability |
HFE |
Human Failure Event |
HLR |
High Level Requirement |
HRA |
Human Reliability Analysis |
HROI |
Hazard Range Of Interest |
HRR |
Heat Release Rate |
HTGR |
High-Temperature Gas-Cooled Reactors |
HVAC |
Heating, Ventilation, And Air Conditioning |
HW |
High Wind |
HWEL |
High Wind Equipment List |
HWPRA |
High Wind Pra |
HWTL |
High-Wind Target List |
I&C |
Instrumentation And Control |
IDHEAS |
An Integrated Human Event Analysis System |
IE |
Initiating Event |
IFPRA |
Internal Flooding Pra |
IGN |
Ignition Frequency (Internal Fire Technical Element) |
IPE |
Individual Plant Examination |
IPEEE |
Individual Plant Examination Of External Events |
ISI |
In-Service Inspection |
ISLOCA |
Interfacing-System Loss-Of-Coolant Accident |
ISRS |
In-Structure Response Spectra |
LAR |
License Amendment Request |
LBE |
Licensing Basis Event |
LCO |
Limiting Condition Of Operation |
LERF |
Large Early Release Fraction |
LIP |
Local Intense Precipitation |
LLNL |
Lawrence Livermore National Laboratory |
LMP |
Licensing Modernization Project |
LMR |
Liquid Metal-Cooled Fast Reactor |
LOCA |
Loss-Of-Coolant Accident |
LOOP |
Loss Of Offsite Power |
LPSD |
Low Power And Shutdown |
LWR |
Light Water Reactor |
MCB |
Main Control Board |
MCC |
Motor Control Center |
MCR |
Main Control Room |
MCRA |
Main Control Room Abandonment |
MCUB |
Minimum Cutset Upper Bound |
MGL |
Multiple Greek Letter |
MHTGR |
Modular High-Temperature Gas-Cooled Reactor |
MOV |
Motor-Operated Valve |
MSO |
Multiple Spurious Operation |
MSR |
Motlten Salt Reactor |
NDM |
Newly Developed Method |
NEI |
Nuclear Energy Institute |
NFPA |
National Fire Protection Association |
NMA |
Nonmandatory Appendix |
non-LWR |
Non-Light Water Reactor |
NPP |
Nuclear Power Plant |
NPSH |
Net Positive Suction Head |
NRC |
U.S. Nuclear Regulatory Commission |
NRR |
(NRC) Office Of Nuclear Reactor Regulation |
NSP |
Non-Suppression Probability |
NSSS |
Nuclear Steam Supply System |
NTTF |
Near-Term Task Force |
NUREG |
U.S. Nuclear Regulatory Commission Technical Report Designation |
NUREG/CR |
Contractor-Prepared Nureg |
OSP |
Off-Site Power |
P&IDs |
Piping And Instrumentation Drawings (Or Diagrams) |
PAU |
Physical Analysis Unit |
PBMR |
Pebble Bed Modular Reactor |
PDS |
Plant Damage State |
PEER |
Pacific Earthquake Engineering Research (Center) |
PFHA |
Probabilistic Flood Hazard Analysis |
PGA |
Peak Ground Acceleration |
PHA |
Process Hazards Analysis |
PMF |
Probable Maximum Flood |
PP |
Plant Boundary Definition And Partitioning (Internal Fire Technical Element) |
PRA |
Probabilistic Risk Assessment |
PRM |
Plant Response Model (Internal Fire Technical Element) |
PSF |
Performance Shaping Factor |
PSHA |
Probabilistic Seismic Hazard Analysis |
PWHA |
Probabilistic Wind Hazard Analysis |
PWR |
Pressurized-Water Reactor |
PWROG |
Pressurized Water Reactor Owners Group |
QA |
Quality Assurance |
QHO |
Quantitative Health Objective |
QLRA |
Qualitative Risk Assessments |
QLS |
Qualitative Screening (Internal Fire Technical Element) |
RAI |
Request For Additional Information |
RAW |
Risk Achievement Worth |
RCB |
Reactor Coolant System Boundary |
RCF |
Release Category Frequency |
RCP |
Reactor Coolant Pump |
RCS |
Reactor Coolant System |
RE |
Reference Earthquake |
RES |
(NRC) Office Of Nuclear Regulatory Research |
RG |
Regulatory Guide |
RHR |
Residual Heat Removal |
RIDM |
Risk-Informed Decision-Making |
RMIEP |
Risk Methods Integration And Evaluation Program |
RMW |
Radius Of Maximum Winds |
RPV |
Reactor Pressure Vessel |
RSDP |
Remote Shutdown Panel |
SA |
Spectral Acceleration |
SAR |
Safety Analysis Report |
SBO |
Station Blackout |
SCDF |
Seismic Core Damage Frequency |
SCR |
Screening Criteria |
SEL |
Seismic Equipment List |
SER |
Safety Evaluation Report |
SFA |
Seismic Fragility Analysis |
SGTR |
Steam Generator Tube Rupture |
SHA |
Seismic Hazard Analysis |
SHARP1 |
Revised Systematic Human Action Reliability Procedure |
SLCS |
Standby Liquid Control System |
SLERF |
Seismic Large Early Release Frequency |
SMR |
Small Modular Reactor |
SOKC |
State-Of-Knowledge Correlation |
SOV |
Separation Of Variables |
SPAR-H |
Standardized Plant Analysis Risk Human Reliability Analysis |
SPID |
Screening, Prioritization, And Implementation Details |
SPR |
Seismic Plant Response Analysis |
SPRA |
Seismic Probabilistic Risk Assessment |
SQUG |
Seismic Qualification Utility Group |
SR |
Supporting Requirement |
SRP |
Standard Review Plan |
SSCs |
Systems, Structures, And Components |
SSHAC |
Senior Seismic Hazard Analysis Committee |
SSI |
Soil-Structure Interactions |
SW |
Service Water |
TEDE |
Total Effective Dose Equivalent |
THERP |
Technique For Human Error Rate Prediction |
THIEF |
Thermally Induced Electrical Failure |
TMRE |
Tornado Missile Risk Evaluator |
TMSC |
Tornado Missile Strike Calculator |
TORMIS |
Tornado Missile |
TS |
Techncial Specifications |
TSTF |
Technical Specifications Task Force |
UHS |
Uniform Hazard Response Spectrum |
USI |
Unresolved Safety Issue |
V&V |
Verification And Validation |
V/H |
Vertical-To-Horizonal (Ratio) |
VEWFD |
Very Early Warning Fire Detection |
VL |
Lower Bound Wind Speed Magnitude |
WCAP |
Westinghouse Commercial Atomic Power (Report) |
XFEL |
External Flood Equipment List |
XFPRA |
External Flood Pra |
ZOI |
Zone Of Influence |